PERMANENT PLACEMENT
Special Tools-
• Bubble Level (3ft)
Perform the following steps to place the dishwasher in its permanent location.
1. Before moving the dishwasher into position, inspect the location site to ensure the electrical,
plumbing, and ventilation services (if required) are provided in the correct locations.
Compare the site connections with the dishwasher to ensure they will match when the
machine is set in its permanent location.
2. Remove the skid.
3. Place a 3ft. level on top of the pot and pan washer or inside the dishwasher on the track
assembly to level the dishwasher front to back. Adjust the level by turning the adjustable
feet. Level side to side with the level place on the top of the unit.
4. Remove the control cabinet cover and the right side panel for the booster cabinet
(if applicable), to expose the electrical terminal connection points.
Plumbing Connections
WARNING:
The installation of this unit must conform to local codes or, in the absence of local codes,
to all National Codes governing plumbing, sanitation, safety and good trade practices.
1. Incoming water supply line is 1” for water connections. Connect the hot water supply at the
final rinse piping connection located at the top right rear of machines with boosters.
2. A “Y” line strainer is provided by Champion for machines without boosters. A pressure
reducing valve (PRV) is provided by Champion for machines with built-in boosters.
3. If the incoming hot water supply pressure exceeds 25 psi [173 kPa], a PRV must be installed
and set to 20-22 psi [138-151 kPa] flowing pressure. The PRV may be purchased from
Champion or supplied by others.
4. Install a manual shut-off valve in the steam and water supply lines to accommodate servicing
the machine. The valve should be the same size as or larger than the supply line.
5. Provide a suitable gravity drain to connect to the 1-1/2" NPT machine drain connection.
INSTALLATION
4
Summary of Contents for PP-28 Corner
Page 4: ...REVISION RECORD CONT REVISIONS ii ...
Page 43: ...35 REPLACEMENT PARTS REPLACEMENT PARTS ...
Page 44: ...36 REPLACEMENT PARTS 5 2 5 1 5 4 3 5 5 5 6 9 7 10 11 12 A B A A 8 Figure 22 Panels ...
Page 48: ...40 REPLACEMENT PARTS 2 1 1 3 6 7 3 5 4 A A A 8 9 10 B B B Figure 24 Cable Pulley Assembly ...
Page 50: ...42 REPLACEMENT PARTS 2 3 3 4 8 7 6 5 3 5 5 5 3 9 10 1 11 12 Figure 25 Counterweight System ...
Page 64: ...56 REPLACEMENT PARTS 2 3 6 4 5 1 7 Figure 32 Scrap Screens Baskets ...
Page 75: ...67 REPLACEMENT PARTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 83: ...75 REPLACEMENT PARTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 84: ...76 REPLACEMENT PARTS 3 5 6 4 5 5 5 1 2 5 3 Figure 40 Side Mount Booster Cabinet ...
Page 86: ...78 REPLACEMENT PARTS 1 2 3 4 7 8 6 9 10 4 11 12 13 5 Figure 41 Pump Assembly ...
Page 88: ...80 REPLACEMENT PARTS 3 4 5 6 7 8 10 1 2 9 11 11 Figure 42 Machine Control Panel ...
Page 94: ...86 REPLACEMENT PARTS 0 1 2 1 2 3 4 6 7 8 5 Figure 45 Vent Fan Control Cabinet Optional ...
Page 98: ...90 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 99: ...91 ELECTRICAL SCHEMATICS ELECTRICAL SCHEMATICS ...
Page 103: ...98 ...
Page 104: ...99 ...
Page 105: ......