47
Service Replacement Parts
Illustration
Page
Pump/Motor Assembly................................................................................................................................................................ 48
3HP, C3/C4 Pump Installation .................................................................................................................................................... 50
1HP, B-30 Prewash Right-Left Pump Installation ....................................................................................................................... 52
1HP, B-30 Prewash Left-Right Pump Installation ....................................................................................................................... 54
3HP, B-30 Prewash Left-Right Pump Installation ....................................................................................................................... 56
3HP, B-30 Prewash Right-Left Pump Installation ....................................................................................................................... 58
Auxiliary Rinse Right-Left Pump Installation............................................................................................................................... 60
C8 Wash/Rinse Wash System Installation ................................................................................................................................. 62
1HP 30" Prewash Right-Left Wash System Installation ............................................................................................................. 64
1HP 30" Prewash Left-Right Wash System Installation ............................................................................................................. 66
C4 Single Tank Wash System Installation .................................................................................................................................. 68
C6 Wash/Rinse Wash System Installation ................................................................................................................................. 70
C4 Wash without Scrap Basket Electric Tank Heat Installation .................................................................................................. 72
C4 Rinse without Scrap Basket Electric Tank Heat Installation .................................................................................................. 74
C4 Wash with Scrap Basket Electric Tank Heat Installation ....................................................................................................... 76
C4 Rinse with Scrap Basket Electric Tank Heat Installation ....................................................................................................... 78
Auxiliary Rinse Tank Heat Installation ........................................................................................................................................ 80
Electric Booster Element Configurations
.................................................................................................................................... 82-87
Electric Booster Installation ........................................................................................................................................................ 88
Float Switches ............................................................................................................................................................................ 90
Final Rinse Installation EUCC8/EUCCW8.................................................................................................................................. 92
Final Rinse Installation C4/C6 EUCC/EUCCW .......................................................................................................................... 94
Auxiliary Rinse Installation EUCC/EUCCW ................................................................................................................................ 96
Cold Water Fill Piping Sub-assembly ......................................................................................................................................... 100
Electric Booster Fill Piping (Prior to S/N J10012728) ................................................................................................................. 102
Electric Booster Fill Piping (Beginning with S/N J10012728 and above) ................................................................................... 104
Fill Piping - No Booster (Prior to S/N J10012728) ...................................................................................................................... 106
Fill Piping - No Booster (Beginning with S/N J10012728 and above) ........................................................................................ 108
#120-1 Steam Booster Installation RL ........................................................................................................................................ 110
#120-1 Steam Booster Assembly RL 40-70°F ............................................................................................................................ 112
#120-1 Steam Booster Installation LR ........................................................................................................................................ 116
#120-1 Steam Booster Assembly LR 40-70°F ............................................................................................................................ 118
Steam Coil Heat Installation C4 Wash, Rinse 15-30 PSI ........................................................................................................... 122
Steam Coil Heat Installation C3 Wash, Rinse 15-30 PSI ........................................................................................................... 124
Steam Coil Heat Installation Auxiliary, 15-30 PSI ....................................................................................................................... 128
Steam Injector Heat Installation C4/C8, 15-30 PSI .................................................................................................................... 132
Steam Injector Heat Installation Auxiliary Rinse RL ................................................................................................................... 136
Drain Installation B-30 Prewash RL ............................................................................................................................................ 138
Drain Installation B-30 Prewash LR............................................................................................................................................ 140
Drain Installation C4 Wash, Rinse .............................................................................................................................................. 142
Drain Installation Auxiliary LR ..................................................................................................................................................... 144
Drain Installation D5 Unload ....................................................................................................................................................... 146
Drain Installation B4 Prewash RL ............................................................................................................................................... 148
Drain Installation B4 Prewash LR ............................................................................................................................................... 150
Drain Installation C3 Wash, Rinse .............................................................................................................................................. 152
Electric Eyes, Start-Stop Station, Flushing Nozzles ................................................................................................................... 154
Idle Shaft Assembly .................................................................................................................................................................... 156
Drive Assembly, Prior to S/N J11062899 ................................................................................................................................... 158
EUCCW Peg Belt and Peg Belt with Upper Rod Conveyor Belts............................................................................................... 160
EUCCW Flat and Insulated Conveyor Belts ............................................................................................................................... 162
EUCCW Stainless Steel Conveyor Belt...................................................................................................................................... 164
EUCC Peg Belt and Peg Belt with Upper Rod Conveyor Belts .................................................................................................. 166
EUCC Flat and Insulated Tray Belts ........................................................................................................................................... 168
EUCC Stainless Steel Conveyor Belt ......................................................................................................................................... 170
Vent Cowl Installation ................................................................................................................................................................. 172
Curtain Locations.....................................................................................................................................................................174-185
Tank Baffles EUCC/EUCCW
...................................................................................................................................................... 186
Control Cabinet (From S/N J2098 up to J08102541) ................................................................................................................. 188
Control Cabinet (From S/N J08012541 up to J10012728) ......................................................................................................... 192
Control Cabinet (Beginning with S/N J10012728 and above) .................................................................................................... 196
Standard 30" Door Assembly ..................................................................................................................................................... 200
Split Door Assembly ................................................................................................................................................................... 202
Swing-out Door Assembly - B-30 R-L/E2 L-R............................................................................................................................. 204
Swing-out Door Assembly - E2 R-L/ B-30 L-R............................................................................................................................ 206
Swing-out Door Assembly - C4................................................................................................................................................... 208
Scrap Screens ............................................................................................................................................................................ 210
Conveyor Shut-off Shelf ....................................................................................................................................... 211
Drive Assembly, Beginning with S/N J11062899 and above ................................................................................ 212
L-R Anti-jam and Tensioner Assembly .................................................................................................................. 213
R-L Anti-jam and Tensioner Assembly .................................................................................................................. 214
Reverse Jog Switch Assembly ............................................................................................................................. 215
Hot Water Coil for C3, EUCCW ............................................................................................................................ 216
Summary of Contents for Eseries
Page 25: ...17 Troubleshooting Operation ...
Page 30: ...22 Blank Page This Page Intentionally Left Blank ...
Page 54: ...46 This Page Intentionally Left Blank Blank Page ...
Page 56: ...48 Pump Motor Assembly ...
Page 58: ...50 1 2 3 4 6 7 8 9 10 11 12 13 1 3 4 4 4 7 5 3HP B4 C3 C4 Pump Installation ...
Page 80: ...72 C4 Wash without Scrap Basket Electric Tank Heat Installation ...
Page 86: ...78 C4 Rinse with Scrap Basket Electric Tank Heat Installation ...
Page 88: ...80 Auxiliary Rinse Electric Tank Heat Installation ...
Page 98: ...90 Float Switches Aux Rinse Power Rinse Wash Pre Wash 1 1 1 2 2 2 3 5 6 4 ...
Page 106: ...98 Blank Page This Page Intentionally Left Blank ...
Page 107: ...99 Blank Page This Page Intentionally Left Blank ...
Page 108: ...100 1 7 2 8 9 5 4 6 3 10 11 Cold Water Fill Piping Sub assembly ...
Page 114: ...106 Fill Piping No Booster Prior to S N J10012728 1 2 3 4 5 6 7 8 9 10 11 12 1 1 7 12 ...
Page 118: ...110 9 12 11 5 4 2 8 8 1 10 5 7 3 2 6 8 1 1 6 120 1 Steam Booster Installation RL ...
Page 120: ...112 120 1 Steam Booster Assembly RL 40 70 F ...
Page 123: ...115 This Page Intentionally Left Blank Blank Page ...
Page 124: ...116 120 1 Steam Booster Installation LR ...
Page 126: ...118 120 1 Steam Booster Assembly LR 40 70 F ...
Page 129: ...121 Blank Page This Page Intentionally Left Blank ...
Page 130: ...122 Steam Coil Heat Installation C4 Wash Rinse 15 30 PSI ...
Page 132: ...124 Steam Coil Heat Installation C3 Wash Rinse 15 30 PSI ...
Page 135: ...127 This Page Intentionally Left Blank Blank Page ...
Page 139: ...131 Blank Page This Page Intentionally Left Blank ...
Page 140: ...132 Steam Injector Heat Installation C4 C8 15 30 PSI ...
Page 143: ...135 Blank Page This Page Intentionally Left Blank ...
Page 154: ...146 2 9 6 7 8 10 11 12 13 14 1 3 4 15 1 3 4 15 Drain Installation D5 Unload ...
Page 168: ...160 EUCCW Peg and Peg w Upper Rod Conveyor Belts ...
Page 169: ...161 EUCCW Peg and Peg w Upper Rod Conveyor Belts ...
Page 170: ...162 EUCCW Flat and Insulated Conveyor Belts ...
Page 171: ...163 EUCCW Flat and Insulated Conveyor Belts ...
Page 172: ...164 EUCCW Stainless Steel Conveyor Belt ...
Page 174: ...166 EUCC Peg and Peg w Upper Rod Conveyor Belts 2 3 4 5 6 7 8 2 3 4 5 6 7 8 9 10 11 ...
Page 176: ...168 EUCC Flat and Insulated Conveyor Belts 2 3 4 5 6 7 2 3 4 5 6 7 8 9 10 11 ...
Page 178: ...170 EUCC Stainless Steel Conveyor Belt 2 4 3 8 5 6 7 ...
Page 180: ...172 Vent Cowl Installation ...
Page 181: ...173 Vent Cowl Installation 1 329806 VENT COWL WELDMENT UCW 04 1 2 401486 VENT STACK 4 x 24 1 ...
Page 199: ...191 Blank Page This Page Intentionally Left Blank ...
Page 203: ...195 Blank Page This Page Intentionally Left Blank ...
Page 207: ...199 Blank Page This Page Intentionally Left Blank ...
Page 208: ...200 Standard 30 Door Assembly ...
Page 210: ...202 Split Door Assembly ...
Page 219: ...211 ...
Page 220: ...212 ...
Page 221: ...213 ...
Page 222: ...214 ...
Page 223: ...215 ...
Page 225: ...217 ...
Page 226: ...218 B ...