12
Operating Instructions
Operation
24.
Flip the dishwasher
power switch up.
25.
The dishwasher
automatically fills
with water.
26.
The tank heat comes
on as soon as the tanks are full.
27.
Wait for 15-20 minutes to allow the wash and
rinse tanks to reach operating temperature.
The prewash tank is not heated so its temperature
may be lower than the wash tank. This is okay.
The final rinse temperature is checked when the dishwasher
conveyor belt and wash pumps are running during normal operation.
R-L shown
Summary of Contents for Eseries
Page 25: ...17 Troubleshooting Operation ...
Page 30: ...22 Blank Page This Page Intentionally Left Blank ...
Page 54: ...46 This Page Intentionally Left Blank Blank Page ...
Page 56: ...48 Pump Motor Assembly ...
Page 58: ...50 1 2 3 4 6 7 8 9 10 11 12 13 1 3 4 4 4 7 5 3HP B4 C3 C4 Pump Installation ...
Page 80: ...72 C4 Wash without Scrap Basket Electric Tank Heat Installation ...
Page 86: ...78 C4 Rinse with Scrap Basket Electric Tank Heat Installation ...
Page 88: ...80 Auxiliary Rinse Electric Tank Heat Installation ...
Page 98: ...90 Float Switches Aux Rinse Power Rinse Wash Pre Wash 1 1 1 2 2 2 3 5 6 4 ...
Page 106: ...98 Blank Page This Page Intentionally Left Blank ...
Page 107: ...99 Blank Page This Page Intentionally Left Blank ...
Page 108: ...100 1 7 2 8 9 5 4 6 3 10 11 Cold Water Fill Piping Sub assembly ...
Page 114: ...106 Fill Piping No Booster Prior to S N J10012728 1 2 3 4 5 6 7 8 9 10 11 12 1 1 7 12 ...
Page 118: ...110 9 12 11 5 4 2 8 8 1 10 5 7 3 2 6 8 1 1 6 120 1 Steam Booster Installation RL ...
Page 120: ...112 120 1 Steam Booster Assembly RL 40 70 F ...
Page 123: ...115 This Page Intentionally Left Blank Blank Page ...
Page 124: ...116 120 1 Steam Booster Installation LR ...
Page 126: ...118 120 1 Steam Booster Assembly LR 40 70 F ...
Page 129: ...121 Blank Page This Page Intentionally Left Blank ...
Page 130: ...122 Steam Coil Heat Installation C4 Wash Rinse 15 30 PSI ...
Page 132: ...124 Steam Coil Heat Installation C3 Wash Rinse 15 30 PSI ...
Page 135: ...127 This Page Intentionally Left Blank Blank Page ...
Page 139: ...131 Blank Page This Page Intentionally Left Blank ...
Page 140: ...132 Steam Injector Heat Installation C4 C8 15 30 PSI ...
Page 143: ...135 Blank Page This Page Intentionally Left Blank ...
Page 154: ...146 2 9 6 7 8 10 11 12 13 14 1 3 4 15 1 3 4 15 Drain Installation D5 Unload ...
Page 168: ...160 EUCCW Peg and Peg w Upper Rod Conveyor Belts ...
Page 169: ...161 EUCCW Peg and Peg w Upper Rod Conveyor Belts ...
Page 170: ...162 EUCCW Flat and Insulated Conveyor Belts ...
Page 171: ...163 EUCCW Flat and Insulated Conveyor Belts ...
Page 172: ...164 EUCCW Stainless Steel Conveyor Belt ...
Page 174: ...166 EUCC Peg and Peg w Upper Rod Conveyor Belts 2 3 4 5 6 7 8 2 3 4 5 6 7 8 9 10 11 ...
Page 176: ...168 EUCC Flat and Insulated Conveyor Belts 2 3 4 5 6 7 2 3 4 5 6 7 8 9 10 11 ...
Page 178: ...170 EUCC Stainless Steel Conveyor Belt 2 4 3 8 5 6 7 ...
Page 180: ...172 Vent Cowl Installation ...
Page 181: ...173 Vent Cowl Installation 1 329806 VENT COWL WELDMENT UCW 04 1 2 401486 VENT STACK 4 x 24 1 ...
Page 199: ...191 Blank Page This Page Intentionally Left Blank ...
Page 203: ...195 Blank Page This Page Intentionally Left Blank ...
Page 207: ...199 Blank Page This Page Intentionally Left Blank ...
Page 208: ...200 Standard 30 Door Assembly ...
Page 210: ...202 Split Door Assembly ...
Page 219: ...211 ...
Page 220: ...212 ...
Page 221: ...213 ...
Page 222: ...214 ...
Page 223: ...215 ...
Page 225: ...217 ...
Page 226: ...218 B ...