6
Installation
SAMPLE
Steam Plumbing and Electrical Drawing
NOTE: 3A THE (OPTIONAL) DRAIN WATER TEMPERING KIT
WILL NEED 1/2" NPT COLD WATER CONNECTION
AT THE BOTTOM OF THE MACHINE
WASH
HP
2
HP
1/6
BSTR
7
5A
5A
1
1
2
5A
8B
8A
8A
8B
6
6
6
1
7
20"
CLEAR
34"
LOAD
HEIGHT
58 14"
MACHINE
HEIGHT
20"
INSIDE TRACK
21 34"
20" DOOR
CLEARANCE
OPENING
934"
5"
12 12"
7 14"
6"
MIN.
33 18"
18 12"
25 34"
634"
12 34"
31 14"
41 34"
44"
44"
8"
8"
4"
4"
2"
2"
48"
26 11
16 "
20 34"
41"
1
2 "
10"
16"
STACK
412"
12"
PIPING
CLEARANCE
5"
30"
2
1
1/2" NPT CONNECTION WITH INTERNAL BOOSTER
(STEPDOWN TRANSFORMER PROVIDES 120V CONT.)
MACHINE REQUIREMENTS 2.17 HP
(110°F)
HOT WATER
ELECTRICAL
UTILITIES
WATER CONSUMPTION 100 GPH AT 20 PSI
5
DRAIN
8
VENTS
(4" X 16")
INSIDE
A. LOAD END: 200 CFM AT 1/4" S.P.
B. UNLOAD END: 400 CFM AT 1/4" S.P.
4
(180°F)
HOT WATER
1/2" NPT WATER CONSUMPTION 100 GPH AT 20 PSI
PRV BY OTHERS WHEN PRESSURE EXCEEDS 60 PSI
(WATER CONNECTION WITHOUT INTERNAL BOOSTER)
A. (OPTIONAL) 1/2" NPT, DRAIN WATER TEMPERING
3
(50°F-70°F)
COLD WATER
DATA CHART
SEE ELEC.
FOR AMP
LOADS
A. 1 1/2" NPT MACHINE
SPECIFICATIONS ARE SUBJECT TO CHANGE BASED ON CONTINUAL PRODUCT IMPROVEMENT
7
6
3/4" NPT MACHINE RETURN TO BOILER
BOOSTER: 85 LB/HR CONSUMPTION
1 1/4" NPT MACHINE
TANK HEAT: 75 LB/HR CONSUMPTION
PRESSURE
NO BACK
CONDENSATE
FLOW PRESS.
(10-30PSI)
STEAM