110524-1
2
LOUVERED SIDE PANELS.
The louver panels have a locking latch on each top corner to secure it in place. To remove the louvered
panel you will need to loosen the latch screws on either side of the panel. Loosen the screws enough
to rotate the latch handle, but do not remove completely. Rotate the latch handle towards the center
of the louvered panel. Tilt the top of the louver panel outward away from the top pan and lift out from
cooler.
To reinstall the panel, first insert the bottom of the panel into the bottom pan. Tilt the panel forward so
that it rests against the top pan. You will need to keep the latch handles rotated to the side to keep the lock from hitting the top
pan. Once the louver panel is in place, rotate the latch handle so that the handle is facing down. Tighten the screws to lock latch
and secure panel in place.
ELECTRICAL CONNECTION
WARNING: Electrical connections should be accomplished by a qualified electrician to ensure all electrical
wiring conforms to local standards.
WARNING: Follow all safety precautions when working with electrical power.
WARNING: Before proceeding with installation, ensure electrical power is disconnected until installation is
complete.
Standard Model 4000RLD4
Note:
This unit comes with the motor and pulley installed. The unit can be controlled with a manual 6 position switch found at
a local hardware store, or with a thermostat such as Champion’s Masterstat
®
Wall Control Thermostat model #110423-2. For
thermostat installation refer to its operating manual. Follow the steps below for manual switch installation:
1. Determine a location on a wall inside the home for the 6 position switch.
2.
Supply 120V or 240V power to switch, depending on motor and pump voltages.
3. Remove screws securing junction box to cooler cabinet.
4. Bring four conductors plus a ground from switch to cooler junction box.
CAUTION: Make sure to use correctly sized wire and follow all local electrical codes.
5. Connect the four conductor wires to the leads of the motor and pump receptacles located in the junction box. Follow the
connection diagrams for 120V or 240V installations.
INSTALLATION
PARTS AND TOOLS NEEDED:
•
5/32 Allen Wrench (for pulley installation)
•
7/16 Wrench or Crescent Wrench
•
Phillips Screwdriver
•
Sill cock or water valve and tubing
•
Multimeter (for amp reading)
CAUTIONS:
Before installing the cooler, note the following items:
•
Before installation, ensure your existing electrical system is rated for the additional amperage draw from unit.
•
Installation inside attic areas is NOT recommended.
•
If installing on brace, or existing construction, ensure structure will hold the operating weight of the cooler. (See specification
table for operating weight.)
•
Ensure entire unit is sufficiently supported.
• We strongly recommend consulting a professional contractor if installation will require cutting through existing structure such
as walls or roof.
• Do not screw or drill into the bottom pan.
• Ensure all electrical work is accomplished to local standards. An electrician may be needed for correct and safe wiring.
WARNING: Disconnect all electrical service that will be used for this unit before beginning the installation
and DO NOT reconnect until installation is complete.
CAUTION: To minimize the potential of water entering building, roof penetration should be limited to the
size of the duct opening from the unit. This roof penetration must then be sealed properly. The overflow
drain must be allowed to drain outside any curb or roof penetration.