background image

 

  

 
 

 

 

I-PR3I-01.doc 

 

 

Issue 03  

18/07/2019 

 

 

 
 
 
 

                                             IOM 

 

PROTECTA LED (IND)

 

 

 

Warning:  

Luminaires are assessed and/or tested for EMC requirements. This is based on the disposition 

                 of entry cables and, where appropriate, through wiring arrangements as supplied or specified. 
                Users must take care not to introduce wiring into parts of the apparatus materially different to that    
                which could be reasonably inferred from the disposition of fixed supply terminals and specified wiring. 

 

3.4    Light Emitting Diodes (LED)

 

LED’s are supplied in either 02L, 04L or 07L options with the colour temperature of 4000K or 5000K. 
 

3.5   Mounting

 

Luminaires  should  be  installed  where  access  for  maintenance  is  practical  and  in  accordance  with  any  lighting 
design  information  provided  for  the  installation.  The  standard  suspension  is  via  two  M8  tapped  holes  in  brass 
bushes in the top of the body, the recommended torque for the fixing bolts is 10-15Nm. (at 400mm centres for 
02L and 04L and 700mm centres for the 07L model). The brass bushes and lock nuts should not be removed 
during installation.  Various adaptors, pole clamps and suspension brackets are available to order. The 02L and 
04L models are available with integral side entry for 42 mm diameter poles (non- emergency only). 
 

3.6   Cable Connection

 

3.6.1    Cables

 

The temperature conditions of the supply cable entry point are such that 70ºC (ordinary PVC) cable can be used.  
300/500V cable ratings are adequate and no special internal construction is necessary.  Where MCB's are used, 
the type with the higher short time tripping current ratio used for motor starting and lighting should be specified.  
The standard maximum looping size is 2.5mm² with options of 4mm² through wiring 
 

3.6.2    Cable Glands

 

Cable glands when installed should maintain the desired IP rating of the enclosure. 
 

3.7   Electrical Connections

 

Luminaires  are  available  for  looping  and  through  wiring.    The  through  rating  is  16A.    Terminals  for  4mm²  and 
6mm²  are  available.    State  which  on  order.    If  work  is  to  be  done  on  any  Luminaire  which  has  already  been 
connected to the electrical system, it must be isolated from the system.  The diffuser cover is swung down and 
removed if convenient by swivelling back as far as possible and the reflector tray is then slid out after releasing 
the locking screws.  This gives access to the mains terminals.  Standard fitting mains terminal blocks have L N E, 
where appropriate.  
 
Mains terminal blocks on the emergency luminaires are marked Lc Ls N Earth. 
Switching the voltage on the Ls connection enables the luminaire to be switched on and off without the 
emergency function being activated.  The Ls connection is insulated from Lc and has a signal function only 
drawing a very small current. 
The  emergency  units  can  be  connected  as  switched  or  un-switched  as  standard,  an  non-maintained  units  on 
request. The switching facility is to allow the luminaire to be switched off whilst still charging the battery.  Where 
switching is required, the un-switched line (Lc) is connected to the continuous mains supply.  A link is fitted during 
assembly between Lc and switched line (Ls); this is removed for the switch-able mode.  If the link is removed and 
Ls not supplied, the unit will only operate on emergency. 
 

3.7.1    Installation of HF and Emergency

 

Following  the  mounting  of  the  apparatus  and  the  connection  of  the  supply  cable  the  unit 

cannot

  be  insulation 

tested.   When  the  unit is  ready  for  operation  the  mains  and  the battery connections must be made, the unit is 
supplied with the battery disconnected.  After commissioning the unit can be shut down for a long period without 
loss  of  function.  However with  emergency versions the  battery should be disconnected to ensure battery life is 
maintained. 
 

3.8  Servicing and Operation 
3.8.1    Opening and Closing the Cover

 

The procedure for opening the cover is as follows: 
Insert the tool into one of the slots in the clamping bar with the end of the tool located into the outer flange of the 
body as a fulcrum point, a wide blade screwdriver is recommended.  Gently lever the tool away from the diffuser, 

Summary of Contents for Protecta Series

Page 1: ... Protecta LED Luminaires Industrial Important Please read these instructions carefully before installing or maintaining this equipment Good electrical practices should be followed at all times and this data should be used as a guide only MODEL SIZE DIMENSION A DIMENSION B 02L 742 400 04L 742 400 07L 1352 700 ...

Page 2: ...e and condensation Any specific instructions concerning emergency Luminaires must be complied with Battery packs in storage should be cycled charged discharged charged every 9 months as per instructions below Always disconnect battery plug and socket for storage Any specific instructions concerning emergency luminaires must be complied with Warning Battery packs not cycled and stored for a year ma...

Page 3: ...and 6mm are available State which on order If work is to be done on any Luminaire which has already been connected to the electrical system it must be isolated from the system The diffuser cover is swung down and removed if convenient by swivelling back as far as possible and the reflector tray is then slid out after releasing the locking screws This gives access to the mains terminals Standard fi...

Page 4: ...5 Commissioning Energise the mains and check that LED s light when the supply is energised Emergency luminaires are supplied with the Battery plug Socket disconnected Just prior to switching power on connect battery plug and socket Emergency luminaires will require battery packs to be cycled to obtain the full duration capacity of the Ni Cd battery cells It is recommended that the unit is charged ...

Page 5: ...ge and replace if necessary 8 If it has been suspected that the Luminaire has suffered mechanical damage a stringent workshop check on all components should be made All components can be removed from the Luminaire for inspection 4 0 Electrical Fault Finding and Replacement The supply must be isolated before opening the Luminaire Any live fault finding must be done by a competent electrician and if...

Page 6: ...ry will remain on charge for an uninterrupted 24 hours At this time the module will conduct a commissioning test for the full duration The 24 hours recharge occurs also if a new battery is connected or the module exits the rest mode condition The following automatic commissioning duration test is only performed when a battery is replaced and fully charged after 24 hrs and the interval time is not ...

Page 7: ... test underway Slow flashing green 1 sec on 1 sec off Duration test underway Red LED on Load failure Open circuit Short circuit LED failure Slow flashing red 1 sec on 1 sec off Battery failure Battery failed the duration test or function test Battery is defect or deep discharged Incorrect battery voltage Fast flashing red 0 1 sec on 0 1 sec off Charging failure Incorrect charging current Green and...

Page 8: ...lektronischen Geräte Systeme 2011 65 EU RoHS II Directive On behalf of the Chalmit I declare that on the date the equipment accompanied by this declaration is placed on the market the equipment conforms to all technical and regulatory requirements of the above listed directives En tant que représentant du fabricant Chalmit je déclare qu à la date où les équipements accompagnant cette déclaration s...