Models EV1020, EV1220, EV1520
Installation, Operation and Maintenance
Rev.12/16/2020
EV-IOM-A.doc
6
S
AFETY
R
EQUIREMENTS FOR
I
NSTALLATION AND
S
ERVICE
Refer to ANSI/ALI ALIS (current edition)
Location
Locate lift to allow plenty of working room on all sides. Allow room for workbenches at
front of bay, aisles, lubrication equipment or other obstructions. Check overhead
clearances. Ordinarily 12 feet is ample for automobiles. Observe the recommended
minimums in
Fig. 1
.
13'-0" Min.
Nearest Obstruction
10'-0" Min.
7'-0" Min.
Fig. 1
New Construction Excavation
New construction requires an excavation as shown in
Fig. 2
.
NOTE:
Concrete must be
finished to edge of concrete tie (3/16” below top of concrete ties, see
Fig. 2
below). All
depths are measured from the finished floor level. Failure to comply will void the
warranty. The power unit may be installed on the nearest wall or floor pedestal. The
power unit should be located out of the working area around the lift and vehicle, but
close enough to allow good visibility while operating the lift. Hydraulic and air lines from
the lift should be recessed under the slab in a 2” sch. 40 PVC chase. CLI will supply
the proper coupling to join the PVC chase to the lift.
Concrete Tie Anchor
102 1/4"
9'-0"
8'-0"
3'-0"
Clean Pea Gravel
Back Fill
2" PVC Chase
8 1/4"
18"
135° Typ.
3/16"
Finished Floor
Fig. 2