Contents
2.1 Preparation before operation
................................................................................ 2
................................................................................. 9
3.2 DTF Measurement in the CAT Mode
................................................................ 15
3.3 Signal Measurement in the SA Mode
............................................................... 16
3.4 Measuring Signal Power in the Power Monitor (PM) Mode
3.5 Measuring the Electrical Length of Cables or Other DUTs in the
VVM Mode
3.6 Measuring Average Power in the UBS-PM Mode
.......................................... 21