
8
Machine Operation
1.
Engage locks on casters.
2.
Install Hopper onto machine base.
3.
Set slide gate to proper position; Position #4 for most open blow fiberglass applications;
Position #5 for cellulose
4.
Install 3.0” diameter blow hose onto Airlock Feeder outlet port; 100’ recommended
5.
Plug machine in using two approved/supplied power cords. Two independent power
circuits are required
6.
Plug in corded remote cord (if applicable)
7.
Disengage Emergency Stop
8.
Position the Selector Switch to
“Corded Remote” or “Wireless Remote”.
9.
Turn the Main Power switch
to the “On” position.
a.
The white “Ready Light” should come on unless the following unsafe conditions
have been met:
Emergency Stop is engaged.
The hopper interlock switch is not depressed, indicating the hopper is installed
incorrectly.
10.
After all safety conditions are met and you are ready to begin the blowing process.
Depress the toggle switch
to “Air/Material” on the Corded Remote Cord or the
“Air/Material” button on the Wireless Remote Control to begin the blowing process.
11.
The Air Speed Control can be used to increase or decrease air flow from the main
blower. For the best open blow performance adjust the knob clockwise to maximum
output.
Upon completion of the job:
1.
Make sure blowing hose is empty by letting air only pass through
2.
Turn electric motor off by moving the disconnect switch to the off position
3.
Wait for machine to completely stop rotating
4.
Unplug extension cords and store properly
Summary of Contents for BOLT 3
Page 8: ...6 Figure 1 3 1 9 4 5 6 7 8 10 11 12 ...
Page 17: ...15 Figure 8 ...