Radikal G30 v.2
Page 29
TAIL BOOM COMPONENTS
When installing all the hardware onto the boom,
make sure you do so prior to installing the tail gear-
box. Otherwise you will not be able to once your tail
gearbox is mounted. Do not apply the zip ties until
the very end when you are sure of the positions of the
tail control rod guides. When building the tail control
rod, make sure to place the control rod through the
guides prior to installing the ends.
Do not install the horizontal fin until you have tight-
ened the tail boom supports and horizontal fin
mount. It is best to install the horizontal fin towards
the end of your build.
Use a 2-part epoxy
or JB Weld when
attaching the Alumi-
num Support ends
to the Carbon Boom
Support Struts.
1
2
3
4
5
8
9
10
12
11
13
14
6
7
15
16
17
18
19
20
21
22
23
CNM3x4SS
M2
CNLR1018
CNM3x14BHCS
CNM2x8PH
CNM3x8ST
M3 CNM3LOCK
CNM2x10PH
CNM3x14BHCS
CNM3x8BHCS
1
1
2
3
4
5
6
4
1
2
2
No.
Description
Qty
Part #
2
7
8
9
10
1
2
2
2
11
12
2
2
13
14
15
17
18
19
1
1
1
2
1
1
16
2
20
21
L=125mm Tail Control Rod(
尾舵控制连杆
)
Plastic Rod End Fittings(
塑料尾拉杆接头
)
Metal Tail Rod Connector(
金属尾拉杆接头
)
Phillips Screw(
圆头十字螺丝
)M2x10
CNM2x10PH
M2 Lockmut(M2
螺母
)
CNM2LOCK
Tail Boom Support Strut End(
连杆头
)
HW6202G3
M2x8 Phillips Screw(
圆头十字螺丝
)
Adjustable Tail Guides(
尾拉杆固定座
)
Horizontal Fin Mount(
水平翼固定座
)
CNM2X8PH
HI6068A
HI6106B
M3x14Button Head Screw(
圆头内六角螺丝
)
CNM3x14BHCS
M3 Lockmut(M3
螺母
)
CNM3LOCK
Self Tapping Screws(
尖尾自攻螺丝
)M3x8
CNM3x8ST
HI6633
HI6633
HI6233
L=670mm Tail Control Rod(
尾舵控制连杆
)
HI6633
Aluminum Support End (
尾支撑杆接头
)
HW6202G3
L=500mm Carbon Tail Boom Supports(
碳纤尾支撑杆
)
HW6202G3
M3x10Button Head Screw(
圆头内六角螺丝
)
CNM3x10BHCS
Tail Boom Support Bridge(
支撑杆防震板
)
Taill Boom Support Bridge(
防震板固定座
)
Set Screw(
无头内六角螺丝
)M3x4
CNM3x4SS
CNM3LOCK
M3 Lockmut(M3
螺母
)
Cable Tie(
扎带
)
HI6106B
Carbon Horizontal Fin
(
水平翼
)
HI6067GHC
M3x8Button Head Screw(
圆头内六角螺丝
)
CNM3x8BHCS
22
23
HI6082A
HI6082A
1
2
1
1