background image

 

 

Revision 3.0  September 2019 
© 2019 Centrica plc. Registered office: Millstream, Maidenhead Road, Windsor, Berkshire. SL4 5GD.  
Registered in England & Wales No 3033654 
 

PAN-14 Sensor installation guide 

Important notes 

 

Do not 

mount the CT on the hot wire before you have already connected 

the PAN-14 sensor securely to the CT! 

 

If a PAN-14 sensor needs to be 

replaced,

 

short circuit the CT’s outputs 

to 

each

 

other using a length of wire 

before

 PAN-14 is disconnected! 

 

Do not 

leave the CT mounted/installed on a hot wire without being short 

circuited. 

 

It is possible to have both the PAN-14 sensor and the short-circuiting wire 
connected to the CT at the same time (but PAN-14 will not measure current 
accurately while the short-circuiting wire is connected). 

Registering the installed sensor 

Se

Panoramic Power deployment guide

. 

Monitoring sensor activity 

Se

Panoramic Power deployment guide

. 

Uninstalling a sensor 

Open the sensor in the way you first opened it and remove it from the cable. 

 

 

Summary of Contents for PAN-14

Page 1: ...1 Operation and maintenance manual Version 3 September 2019 PAN 14 Sensor installation guide ...

Page 2: ... However there is no guarantee that interference will not occur in a particular installation If this device does cause such interference which can be verified by turning the device off and on the user is encouraged to eliminate the interference by one or more of the following measures Re orient or re locate the receiving antenna Increase the distance between the device and the receiver Connect the...

Page 3: ...s radio exempts de licence L exploitation est autorisée aux deux conditions suivantes 1 l appareil ne doit pas produire de brouillage et 2 l utilisateur de l appareil doit accepter tout brouillage radioélectrique subi même si le brouillage est susceptible d en compromettre le fonctionnement Une distance d au moins 10 cm entre l équipement et toutes les personnes devraient être maintenues pendant l...

Page 4: ... 4 PAN 14 Sensor installation guide Contents Overview 5 Workflow 5 Unpacking the hardware 5 Safety precautions 6 Mapping the site 6 Installing the sensor 6 Registering the installed sensor 8 Monitoring sensor activity 8 Uninstalling a sensor 8 Sensor specifications 9 Range of rated environmental conditions 10 Certified CTs 10 Troubleshooting 11 Support 11 ...

Page 5: ...tall the PAN 14 sensors PAN 14 Current sensor Current Transformer CT Workflow Sensor installation consists of the following steps 1 Map the circuits See Panoramic Power deployment guide 2 Physically attach the sensors and the CTs to the wires 3 Monitor the proper functioning of the sensors See Panoramic Power deployment guide Unpacking the hardware Sensors are shipped in 3 unit packs CTs are not i...

Page 6: ...t the arrow points in the direction of the load Caution Protection provided by the equipment can be impaired if used in a manner not specified by the manufacturer Mapping the site See Panoramic Power deployment guide Installing the sensor PAN 14 and the associated current transformer should be installed in a location not accessible to an average user The voltage and current measurement circuit ins...

Page 7: ...he direction of current flow on the wire is from the side marked P1 or H1 on the CT to the side marked P2 or H2 on the CT Other used CT polarity markings are K for entry and L for exit or Load side respectively P1 and P2 3 Make sure the sensor s LED is blinking 4 Finalize the PAN 14 sensor and the CT s position on the panel a Maintain a reasonable distance between the CT and the sensor b Place the...

Page 8: ... to each other using a length of wire before PAN 14 is disconnected Do not leave the CT mounted installed on a hot wire without being short circuited It is possible to have both the PAN 14 sensor and the short circuiting wire connected to the CT at the same time but PAN 14 will not measure current accurately while the short circuiting wire is connected Registering the installed sensor See Panorami...

Page 9: ...r 0 03 0 05 A AC frequency supported 50 Hz EU JPE 60 Hz US JPW Transmission frequency 434 MHz EU 915 MHz US 923 MHz JPE JPW Transmission power ERP 0 dBm max 4 dBm max JPE JPW Transmission interval 10 seconds Certification USA and Canada Safety UL 61010 1 UL 61010 2 030 CAN CSA C22 2 No 61010 1 ETL listed EMC FCC Part 15 subpart B ICES 003 Radio FCC Part 15 subpart C RSS 210 RSS Gen Europe Safety E...

Page 10: ...00m CAT III Pollution Degree 2 Certified CTs General notes Solid core or split core CTs can be used CT s accuracy class should be 0 5 or better Relay CTs Rogowski coils or CTs with included burden resistors cannot be used The following list includes the CTs that were already tested and approved by Panoramic Power Dixsen CTs 600A split model DBP 58 600A non split rectangular model MES 62 1000A spli...

Page 11: ...ons Problem Solution The sensor is not sending measurements Make sure the circuit has current Make sure that the sensor arrow points in the direction of the load Make sure that the sensor LED is blinking Make sure the sensors are near enough to the Bridge for the Bridge to receive its signals Check the reception LED of the Bridge If it is not blinking it means that it is not receiving signals Supp...

Reviews: