Please check the construction set for completeness
using the position list in good time before starting
construction or commissioning your construction
team.
If individual parts are defective or missing, we will
deliver these as quickly as possible. However, we cannot
refund the costs for any resulting construction delays to a
construction company.
Please understand that we cannot assume any
guarantee for the following defects:
- incorrect storage before assembly
- incorrect anchoring with the ground or inadequate
foundation (foundation according to statics)
- damage due to erection errors, e. g. the house is not
level or not right-angled
- damage through a higher level of snow burden than
statically envisaged. Recommendation: lad relief of the
roof by removing the snow layer
- storm damage (insurance cases) or violent destruction
- damage through any alteration to the design by the
client
- natural formation of cracks, branch holes, twisting,
decolouration or similar modification (natural process;
has no influence on the statics)
Storage information until construction:
- Store pallet on a level and dry surface.
- Protect from exposure to sunlight and the influences of
weather; wood can warp drastically in a loose
condition!
Maintenance tips:
The wood is untreated.
Accordingly, regular, protective coating
is absolutely necessary! Please observe
the attached information sheet “Care
instructions/Colour
treatment”.
General tips and refers to:
The packaging foil
can be used
to keep
moisture out of the house. It is laid according
to the ground area of the house under the
main bearing.
As the house is exposed constantly to the
weather, it is necessary to lay a further
welding line. You have to make it for your own.
A possibly desired installation of a rain gutter
must be done by the building contractor; for
this the roofing boards must be cut to the right
length.
Foundation according to the structural
calculations
(not included in the scope of
delivery): concrete C25/30, each 2 Ø 12 top
and bottom, brace mat R188A (alternatively
brace Ø 6/20cm). Anchoring of the floor
beams (in the building) on the strip foundation
using bolts M12, e < 60cm. The base bearings
in the storeroom of the house must be entirely
flush.
During the assembly of the planks it is
essential to make sure that the planks are
fixed with approx. 1mm distance and the top
planks have the same height all around.
Due to storage, the measurements of the
planks may change over time and change the
heigth of the wallplanks.Please remember this
during the installation of the planks, otherwise
it may result in different wall heights.
If the door
cannot be closed properly,
this
can be adjusted by
turning the hinges.
The roofing boards are laid out up to the inner
edge of the outer facing. The final roofing
board must be adjusted in width. The roofing
boards must be cut out as necessary in the
area near the fastening wood H16/58-00
(34cm).
It is planned to have the roofing paper go up
the sides over the existing gap as high as the
facing, and to attach it there on the facing. The
building contractor can also lay strips over the
gap, or the roofing paper can be laid right up
to the upper edge of the facing; this will then
be covered by the aluminium strip A100-220.