Please check the construction set for completeness
using the position list in good time before starting
construction or commissioning your construction
team.
If individual parts are defective or missing, we will
deliver these as quickly as possible. However, we cannot
refund the costs for any resulting construction delays to a
construction company.
Please understand that we cannot assume any
guarantee for the following defects:
- incorrect storage before assembly
- incorrect anchoring with the ground or inadequate
foundation (foundation according to statics)
- damage due to erection errors, e. g. the house is not
level or not right-angled
- damage through a higher level of snow burden than
statically envisaged. Recommendation: lad relief of the
roof by removing the snow layer
- storm damage (insurance cases) or violent destruction
- damage through any alteration to the design by the
client
- natural formation of cracks, branch holes, twisting,
decolouration or similar modification (natural process;
has no influence on the statics)
Storage information until construction:
- Store pallet on a level and dry surface.
- Protect from exposure to sunlight and the influences of
weather; wood can warp drastically in a loose
condition!
Maintenance tips:
The wood is untreated.
Accordingly, regular, protective coating
is absolutely necessary!
Please observe the attached information
sheet
“Care
instructions/Colour
treatment”
The packaging foil
can be used
to keep
moisture out of the house. It is laid according
to the ground area of the house under the
main bearing.
Given that the roof is constantly exposed to
the weather, a covering with only one layer
of roofing paper will not be enough over
the long-term. An additional covering with
bitumen shingles, alternatively with a material
of at least equivalent quality, must follow. We
recommend clearing the roof during heavy
snowfall!
Foundation according
(to the structural
calculations, not included in the scope of
delivery): concrete C25/30,
strip foundation:
w/h = 30/90cm, each 2 Ø 12 top and
bottom, bow Ø 6, e ≤ 20cm.
Bottom panel:
t=14cm,Q188A, top and bottom throughout.
Anchoring of the floor beams on the strip
foundation using bolts M12, e ≤ 60cm (by
customer).
The wooden parts of the building kit are
delivered with a residual moisture content
of about 15%. Wood ”works”! This means
that the wooden parts will swell during
prolonged damp weather and shrink (dry
out) during prolonged dry periods. This only
occurs in height or width, not lengthwise.
The block planks are firmly screwed to the
vertical corner post during installation. This
will not change its length, but the horizontally
attached planks change their height. If damp
weather persists, the block planks can swell
slightly after completion. It is therefore
important to leave 1mm clearance between
the planks when fitting. Use the enclosed
spacer (to avoid unnecessary strains in the
structure).
If the door does not close correctly, this can be
readjusted by
rotating the hinges
in the door
leaf and door frames.
1
1
Technical modifications reserved.
All dimensions are approximate dimensions.
Date 02/2022