
4
Each valve member and the
mounting relationship of the agitator shaft assembly
•
When mounting the intermediate shaft, the mounting position and orientation note red tapered sealing ring, shown in FIG.
- -
When the ring is not installed properly or missing equipment, raw materials from the hole before the panel out of the machine, in case this happens, the refrigeration cylinder of raw
materials released as soon as possible, and re-install the correct ring
•
After stirring for installation around the rotary shaft, the stirring shaft is pushed into the refrigerant cylinder, until the rear side of the card into Falcon
- -
After stirring shaft rotational resistance will be significantly increased properly installed
- -
If the stirring blade axis direction is incorrect will not be charged in the refrigeration tank, can successfully replace the blade mounting direction
•
Before installing the discharge valve element, positioning blocks need to be protruding to a vertical position prior
to the stirring shaft is aligned with the recess on the body
•
When the discharge valve is mounted, on both sides of the nut to be tightened uniformly biased, and tighten
avoid side, and do not use a tool
Expanded tube assembly
•
Expanding the extruded tube apparatus, a metal intake manifold, silicone hoses three parts, as shown in FIG
installation
- -
To ensure the stability of the ice cream puff, follow the steps in Chapter feeding operation,
Expanded pipe and then into the first
To ensure the stability of the ice cream puff, follow the steps in Chapter feeding operation,
Expanded pipe and then into the first
insert feed
- -
After the damaged hose ends, please cut use, replace the hose if necessary
- -
Cleaning accessory bore tube extruded silicone hose and brush, and a spare seals and hoses, Keep