![Cedar Summit WESTBURY F25030 Installation And Operating Instructions Manual Download Page 65](http://html1.mh-extra.com/html/cedar-summit/westbury-f25030/westbury-f25030_installation-and-operating-instructions-manual_2578715065.webp)
65
Step 31: Attach Belt Swings and Acro Swing
Other Parts
Fig. 31.1
Fig. 31.2
Swing Belt
Seat
Threaded Clip
Swing
Belt Seat
Acro Bar
Acro Handles
Threaded
Clip
Fig. 31.3
Threaded
Clip
A:
Using 1 Threaded Quick Link per chain, join 1 Long Chain to each side of the Swing Belt Seat. Make sure
to close the Threaded Quick Link tightly using an adjustable wrench. (fig. 31.1 and 31.2).
B:
Using 1 Threaded Quick Link per chain, join the Short Chain to the Acro Bar. Attach another Threaded
Quick Link to each Acro Handle and join with first Threaded Quick Link. Make sure to close the Threaded
Quick Link tightly using an adjustable wrench. (fig. 31.2 and 31.3)
C:
Attach the other end of the swing chains to the Swing Hangers. Make sure to close the Threaded Quick
Link tightly using an adjustable wrench. (fig. 31.1)
Caution: Threaded Quick Links
must be installed with the gate
completely down covering
the threads and tighten as
instructed. (fig. 31.2)
Short
Chain
Long Chain
1 x Acro Bar
2 x Acro Handle
2 x Swing Belt Seat
2 x Short Chain
4 x Long Chain
8 x Threaded Quick Link
Tighten Threaded Quick
Link using adjustable
wrench
Threaded Quick Links
attach to seat and Acro
bar.