11. Finishing
•
Make sure that the sub-rack/cabinet is properly fixed to the cabinet/floor
•
Make sure that the sub-rack/cabinet is connected to Ground.
•
Make sure that all DC and AC input breakers are switched OFF.
•
Make sure that all cables are according to recommendations and local regulations.
•
Make sure that all cables are strained relived.
•
Make sure that all breakers are according to recommendation and local regulations.
•
Make sure that DC polarity is according to marking.
•
Re tighten all electrical terminations.
•
Make sure that no inverter/controller positions are left open.
•
Cover empty inverter positions with dummy cover.
•
Make sure that the Remote ON/OFF is appropriately wired according to local regulations.
•
Make sure that the point of AC supply meets local regulations.