background image

14

cdvigroup.com

EN

ATRIUM A22POEPOE

2-Door Controller

  INSTALLATION MANUAL

EN

ATRIUM A22POEPOE

2-Door Controller

  INSTALLATION MANUAL

INSTALLING THE A22POE  PC BOARD

Install the 5 fasteners (PCB holder) supplied respectively to the box holes identified in red in the following 

picture. Install the A22POE PCB by aligning the fasteners with the corresponding PCB holes and pressing firmly 

to secure the PCB in place.

      

Summary of Contents for ATRIUM A22POE

Page 1: ...The installer s choice cdvigroup com ENGLISH EN A22POE Web Based PoE 2 Door Hybrid Controller Power Over Ethernet...

Page 2: ...N 3 2 NOTES AND RECOMMENDATIONS 4 FCC IC Compliance 4 UL Compliance 4 UL 294 Compliance Notice 4 Free Technical Support 4 Recommended Wiring 5 Specifications 5 3 PACKAGE CONTENTS 7 Location and Mounti...

Page 3: ...t an industry leader in efficiency and simplicity Control 2 doors 2 readers Embedded Web Server Pre assembled PoE Splitter On board Ethernet Port with AES 256 bit encryption Auto detect hardware modul...

Page 4: ...eaders Wiegand 26 bit 30 bit and 40 bit mag stripe up to 32 digits Use of a UL recognized tamper switch on every housing cabinet for the A22POE Use only UL listed cables Use only UL listed adaptors No...

Page 5: ...pandable to 10 doors Cards and users Up to 10 000 cards and users Schedules Up to 250 Schedules each supporting up to 100 time periods dd hh mm Buffered Events Up to 25 000 events Holidays Up to 100 h...

Page 6: ...nt limited monitored Power output specifications Battery Backup Battery Capacity 12Vdc 7Ah rechargeable acid lead or gel cell backup battery UL ULC YUASA NP7 12 recommended Europe CDVI B7AH recommende...

Page 7: ...d a white wire 115mm 3 wires for tamper switch 2 x 360mm and 1 x 165mm Bolts and Nuts Wall Switch Spacer Door Switch and 2 white wires 350mm Door Switch Support Metal box screw for door enclosure Meta...

Page 8: ...et Can Accommodate One 12Vdc 4 5AH or 7AH gel cell type batteries and wiring connections 15cm 6 high 6cm 2 5 wide 9 cm 3 54 deep Battery Model Voltage Capacity Length Width Height YUASA NP7 12 12 Volt...

Page 9: ...be prepared before fixing it to its location Installing the Tamper Switches Installing tamper switches allows the A22POE to detect when the cabinet door is opened and or when the cabinet is removed f...

Page 10: ...abinet Side View Cabinet Door Nut Spacer Spacer Screw Spacer Install the wall tamper switch using the supplied bolts and nuts as shown in the following picture Install the tamper switch plastic spacer...

Page 11: ...bracket on the mounting flange Door Tamper Switch Bracket Door Tamper Switch Mounting Flange Install the door tamper switch by aligning the switch holes to the pre installed plastic bracket pins Press...

Page 12: ...he box door knock out 2 Insert the lock in the hole 3 Slide the U metal part into the lock groove to secure the lock in place Alternatively or complementary to the box lock the box may be secured by f...

Page 13: ...ing the Box to its Location Install the box to its location using 4 screws not supplied as shown in the following picture If the wall tamper switch is used make sure that the tamper switch arm moves f...

Page 14: ...nstalling the A22POE PC board Install the 5 fasteners PCB holder supplied respectively to the box holes identified in red in the following picture Install the A22POE PCB by aligning the fasteners with...

Page 15: ...PUTS RS485 LOCAL BUS BATTERY 12V DC INPUT POWER SUPPLY ETHERNET LOCAL BUS STATUS LOCK 1 SETTING LOCK 2 SETTING READERS INPUTS LOCKS A22 2 Door Web Based IP Module DOOR 1 DOOR 1 DOOR 2 DOOR 2 DOOR 1 DO...

Page 16: ...ch to the TMP terminals using the supplied wire 2 Connect the other terminal of the same tamper switch to the GND terminals using the supplied wire If you do not use the tamper switch connect a wire b...

Page 17: ...has been left open after a valid access or the door has been forced open The functions of all these outputs are programmable through the ATRIUM software INPUTS OUTPUTS RS485 LOCAL BUS BATTERY 12V DC...

Page 18: ...fferentiate between a door forced open and an authorized exit Inputs REX 1 and REX 2 are assigned by default for Door 1 and Door 2 REX inputs respectively Door 1 Factory Default Input Settings same se...

Page 19: ...r INPUT in Software as described in the following figure This setup will not support WIRE CUT supervision but offers WIRE SHORT supervision and will generate an alarm condition when the state of the i...

Page 20: ...will support WIRE CUT supervision but not WIRE SHORT supervision and will generate an alarm condition when the state of one of the input is breached WIRE SHORT supervision NO WIRE CUT supervision YES...

Page 21: ...of Locking Device page 22 If the lock or electromagnetic requires 24Vdc you m ia gram page 22 The same applies if the Locking Device requires an alternating current supply Vac INPUTS OUTPUTS RS485 LOC...

Page 22: ...Output 2 ETHERNET 24V DC INPUT BATTERY MODULE TYPE SYSTEM STATUS Electromagnetic Door Lock Door 2 Door Strike Door 1 De energize lock output Energize lock output 12V 0V 12V 0V ETHERNET LOCAL BUS STAT...

Page 23: ...mmable Adaptive battery charging algorithm 250mA default 320mA 500mA or 1A Intelligent battery monitoring charging algorithms allowing optimum performance using standard lead acid or gel cell type bat...

Page 24: ...can be used The battery charge current can be set to either 250mA default 320mA 500mA or 1A Refer to the ATRIUM user interface instruction manual for more information on how to modify the battery char...

Page 25: ...24V DC INPUT BATTERY MODULE TYPE SYSTEM STATUS 1 5 6 2 3 4 1 ETHERNET ACT Green LED flashing Data transmitted received LNK Green LED Ethernet network detected 2 LOCAL BUS RX Green LED flashing Data r...

Page 26: ...DOOR 1 DOOR 2 DOOR 2 DOOR 1 DOOR 2 DATA 1 Red LED 1 Green LED 1 Buzzer 1 DATA 0 12V DC DATA 1 Red LED 2 Green LED 2 Buzzer 2 DATA 0 12V DC Com Relay 1 N O Relay 1 N C Relay 1 Lock output 1 Com Relay 2...

Page 27: ...ller or expander on page 15 to set an A22POE as an expander Connect the expander modules using these topologies cdvigroup com cdvigroup com cdvigroup com cdvigroup com cdvigroup com A22POE A22POE A22P...

Page 28: ...begin flashing in sequence 2 Red flashes 2 Green Enrollment mode is active 3 Present cards one by one to the reader NEW cards will be ADDED Green LED will flash and a quick beep will be emitted Each n...

Page 29: ...ble in the event of loss or non presentation of the form The 5 Year Warranty only applies to products installed by a skilled and experienced personal with the necessary trade qualifications to install...

Page 30: ...consumables such as fuses lights and batteries for example Failure or malfunctioning as a result of an accident poor storage conditions unsuitable assembly bad utilization or handling poor maintenanc...

Page 31: ...31 cdvigroup com EN ATRIUM A22POE 2 Door Controller INSTALLATION MANUAL NOTES...

Page 32: ...ANADA USA LATIN AMERICA Phone 1 450 682 7945 Fax 1 450 682 9590 CDVI BENELUX BELGIUM NETHERLAND LUXEMBOURG Phone 32 0 56 73 93 00 Fax 32 0 56 73 93 05 CDVI TAIWAN Phone 886 0 42471 2188 Fax 886 0 4247...

Reviews: