EN-6
Turn the door 180 degrees upside down and fit the top door axis hole to the top left
hinge
⑥
and put lower hinge plate
⑤
on the lower hinge
①
and keep the door steady
to screw the lower hinge plate
⑤
with the left bottom door frame. [Figure 4] Door
reversing is finished.
Operation
Start operation
1. Cleaning the compartment
Before power on, clean inside of the appliance and check the drainage pipe in good
connection.
(
For details, please refer to the
“Maintenance and cleaning”
)
2. Placement
Before powering on, level the appliance on the firm & dry floor for at least 30 minutes.
3. Power on
The appliance start operation and it will cool down inside after 1 hour, otherwise you
should check the power connection.
Control panel
All keys would be invalid if in lock mode. Please unlock first.
ON/OFF
1. Keep pressing the key 3 seconds, power down, goes to stand-by mode.
2. Keep pressing the key again 3 seconds to return back to normal working.
Light
Press the key, turn on or turn off the LED lights inside. In stand-by mode, the key is
invalid.
Zone switch
Press the key to switch between upper zone and lower zone for choosing which zone
to set temperature. Press the key once, the LED display in chosen zone flash
regularly. Press up and down key to set temperature. Press the key again; switch to
other zone to set temperature.