6 - WORKING OPERATIONS
4. Roll back the coupler with attachment to align the at-
tachment pin holes with coupler locking pins.
LEIL15WHL1831AA
3
5. Press the coupler engagement button to extend the
locking pins. Once the locking pins are fully extended,
the red light goes out and the green light turns on.
See figure
(A)
for JRB compatible coupler or figure
(B)
for ACS compatible coupler.
6. Maintain the coupler in rollback position. Position the
red coupler locking visual indicators
(1)
in your full field
of view. Verify and ensure the coupler locking pins
(2)
are fully extended.
LEIL16WHL1339AA
4
RAIL12WEL0323BA
5
7. Lower the attachment and roll the front end toward
the ground. Apply downward pressure to ensure the
attachment is securely locked.
LEIL16WHL0039AB
6
6-7
Summary of Contents for 621G Stage IV
Page 42: ...2 SAFETY INFORMATION Empty tool LEEN11T0024AA 20 2 22 ...
Page 60: ...2 SAFETY INFORMATION 2 40 ...
Page 137: ...3 CONTROLS AND INSTRUMENTS Inducement and validation re starts LEIL14WHL0394HA 2 3 77 ...
Page 138: ...3 CONTROLS AND INSTRUMENTS Validation re start procedure LEIL15WHL0608HA 3 3 78 ...
Page 150: ...3 CONTROLS AND INSTRUMENTS 3 90 ...
Page 166: ...4 OPERATING INSTRUCTIONS RCPH10WHL045BAH 7 4 16 ...
Page 168: ...4 OPERATING INSTRUCTIONS RCPH10WHL045BAH 9 4 18 ...
Page 170: ...4 OPERATING INSTRUCTIONS RCPH10WHL045BAH 12 4 20 ...
Page 208: ...6 WORKING OPERATIONS 6 18 ...
Page 229: ...7 MAINTENANCE DEF AdBlue technical faults LEIL14WHL0392HA 4 7 21 ...
Page 370: ...7 MAINTENANCE 7 162 ...