
6871082-R2
4
INSTALLATION
CL3378.eps
CC0198.eps
CC0197.eps
CC0033.eps
Prepare Hoses
A
Determine hose lengths required for hydraulic
supply configuration of truck.
B
Cut hoses to length and install end fittings, or
use hose kits supplied.
IMPORTANT:
Valve options include LH or RH supply
porting for Clamp/Open and Sideshift Left/Right.
External sideshifter has top center location porting
suitable for both LH or RH supply connections.
Open
Sideshift Left
Sideshift Right Clamp
RH CLAMP, LH SIDESHIFT Ports
Back (Driver's) Views
Non-Sideshifting – Single Internal Hose Reeving
Sideshifting Clamp – Double Internal Hose Reeving
External Sideshifting Clamp – Double Hose Reels
Sideshifting with Solenoid – 6-N-1 Cable/Hose Reel
Non-Sideshifting – Single Hose Reels
Sideshifting Clamp – Double Hose Reels
LH CLAMP, RH SIDESHIFT Ports
EXTERNAL SIDESHIFTER-EQUIPPED
TIPPING with SOLENOID-EQUIPPED
Open
Sideshift Left
Sideshift Right
Clamp
3
Open
Sideshift Left
Sideshift Right
Clamp
Open
Clamp
Sideshift Left/
Tip Forward
Sideshift Right/
Tip Back
SOLENOID-EQUIPPED RH or LH CLAMP Ports
Solenoid Cable
Sideshift Left / Open
(TANK Port)
Sideshift Right / Clamp
(PRESSURE Port)
A
A
B
B
Sideshifting Clamp – Double Internal Hose Reeving
CC0199.eps