Installation and operation
Installation, Operation & Maintenance of the Wireless Sensing Family
15
3
Installation and operation
Installation of a system site consists of the following stages;
Planning – pre-installation.
Assembling and mounting of the components..
Acceptance testing of overall system.
3.1
Pre-installation Preparations
Pre-installation preparations are crucial for a successful installation of the
CartaSense system and must be performed precisely and thoroughly.
The purpose of the pre-installation preparation is:
•
Identify the best location for the system components in order to
optimize the performance of the system.
•
When using GPRS USG verify availability of good cellular
communication in the area of installation.
•
Verify high enough locations for mounting USG units to prevent
them from being damaged by forklifts and loads.
•
Locate AC outlets - Verify power outlet availability near the USG’s
planned location
•
Check for the best location to place a Resident Sensor, if any. This
depends on:
-
Size of area to be covered.
-
Specific needs (special cooling rooms, far dockings…)
•
Estimate number of RS needed.
•
Check coverage
•
Add RS in places with low coverage
3.1.1
Tools
The installation team should to be equipped with the following tools:
Cellular phone SIM free with WEB surfing capabilities - a cellular
phone that works with any SIM card and is capable of surfing the
internet.
Laptop with cellular internet communication.
Safe SIM – A SIM card with all the characteristics, as described in
paragraph
2.6.3 should be verified ahead of time that it is suited for
operation with the CartaSense system.
Power cord extender.
Thin screw driver – to pull the SIM card compartment out.
Mini USB connector – for debug purposes.