9

Unloader Test Procedure

The unloader is the compressor internal mechanism, controlled by the

DC  solenoid,  that  modulates  between  high  and  low  stage.    If  it  is

suspected that the unloader is not working, the following methods may

be used to verify operation.

1. Operate the system and measure compressor amperage.  Cycle the

unloader on  and off at 30 second plus intervals at the thermostat

(from low to high stage and back to low stage).  Wait 5 seconds

after  staging  to  high  before  taking  a  reading.    The  compressor

amperage should go up or down at least 20 percent.

2. If   the  expected result  is not  achieved, remove the solenoid  plug

from the compressor and with the unit running and the thermostat

calling for high stage, test the voltage output at the plug with a DC

voltmeter.  The reading should be 24 volts DC.

3. If  the  correct  DC  voltage  is  at  the  control  circuit  molded  plug,

measure  the  compressor  unloader  coil  resistance.   The  resistance

should be approximately 1640 milliohms.  If the coil resistance is

infinite or is grounded, the compressor must be replaced.    

Final Checks

IMPORTANT: 

Before leaving job, be sure to do the following:

1. Ensure that all wiring is routed away from tubing and sheet metal

edges to prevent rub-through or wire pinching. 

2. Ensure that all wiring  and  tubing  is  secure  in  unit  before adding

panels and covers. Securely fasten all panels and covers. 

3. Tighten service valve stem caps to 1/12-turn past finger tight.
4. Leave Owner’s Manual with owner. Explain system operation and

periodic maintenance requirements outlined in manual. 

5. Fill out Dealer Installation Checklist and place in customer file.

Troubleshooting

If  the  compressor fails to  operate with a cooling call, the table below

(Resistance table) can be used to  verify if  there is any  damage  to the

compressor windings causing system malfunction. 

Major Components

2-Stage Compressor

The  2-stage  compressor  contains  motor  windings  that  provide  2-pole

(3500 RPM) operation. 

Compressor Internal Relief

The compressor is protected by an internal pressure relief (IPR) which

relieves discharge gas into compressor shell when differential between

suction  and  discharge  pressures  exceeds  and  550  -  625  psi.  The

compressor is also protected by an internal overload attached to motor

windings.

Compressor Control Contactor

The contactor has a 24 volt coil and is controlled by Y1 input from the

thermostat

Low Pressure Switch

Low  pressure  switch  is  provided  in  line  with  the  Y1  signal  to  the

contactor for protection. 

Care and Maintenance

For  continuing high performance and  to minimize  possible  equipment

failure, periodic maintenance must be performed on this equipment. 
Frequency of maintenance may vary depending upon geographic areas,

such as coastal applications. See Users Manual for information. 

Table 3 – Winding Resistance

Winding

Winding resistance at 70°F +/- 20°F

(21.11°C +/- 11.11°C)

Unit Size

024 

 036 

 048 

 060 

Start (S-C)

1.652

1.587

1.299

1.203

Run (R-C)

1.065

0.751

0.477

0.383

®

Summary of Contents for N4H7T

Page 1: ...opriate for unit capacity 3 Run refrigerant tubes as directly as possible by avoiding unnecessary turns and bends 4 Leave some slack between structure and unit to absorb vibration 5 When passing refri...

Page 2: ...pace for airflow clearance wiring refrigerant piping and service Allow 24 in 609 6 mm clearance to service end of unit and 48 in 1219 2 mm above unit For proper airflow a 6 in 152 4 mm clearance on 1...

Page 3: ...ton body of the liquid service valve temporarily held in place with a plastic cap Do not remove the plastic cap until line set tubing is ready to be installed Refer to Fig 4 and follow these steps for...

Page 4: ...h a heat sinking material such as a wet cloth Braze joints using a Sil Fos or Phos copper alloy Install Liquid Line Filter Drier Indoor Refer to Fig 6 and install filter drier as follows 1 Braze 5 in...

Page 5: ...readily accessible from unit per Section 440 14 of NEC Route Ground and Power Wires Remove access panel to gain access to unit wiring Extend wires from disconnect through power wiring hole provided a...

Page 6: ...at the Y2 signal is communicated via the cool tap to the desired speed tap 2 The Y1 call for low stage cooling energizes the Fan tap on the control board The red wire from the fan tap is connected to...

Page 7: ...5 minute time guard begins counting Compressor will not come on until this delay expires In the event of a power interruption the time guard will not allow another cycle for 5 minutes Compressor Opera...

Page 8: ...or temperature is between 70 F and 80 F 21 11 C and 26 67 C Follow the procedure below Unit is factory charged for 15ft 4 57 m of lineset Adjust charge by adding or removing 0 6 oz ft 018 kg m of 3 8...

Page 9: ...nit before adding panels and covers Securely fasten all panels and covers 3 Tighten service valve stem caps to 1 12 turn past finger tight 4 Leave Owner s Manual with owner Explain system operation an...

Page 10: ...ved A Carrier Company Edition Date 03 22 Catalog No N4H7T 01SI Replaces New N4H7T Installation Instructions Manufacturer reserves the right to change at any time specifications and designs without not...

Reviews: