7

Airflow Selection for FV4C Fan Coils

(non-communicating)

The FV4C provides high- and low-stage blower operation to match the

capacities of the compressor at high- and low-stage. 
To  select  recommended  airflow,  refer  to  the  FV4C  Installation

Instructions. The FV4C utilizes an Easy Select control board that allows

the installing technician to select proper airflows. This fan coil has an

adjustable blower-off delay factory set at 90 sec. for high- and low-stage

blower operation.

Start-Up

Follow these steps to properly start up system:

1. After  system  is  evacuated,  fully    open  liquid  and  vapor  service

valves. 

2. Unit is shipped with valve stem(s) front seated (closed) and caps

installed. Replace stem caps after system is opened to refrigerant

flow  (back  seated).  Replace  caps  finger-tight  and  tighten  with

wrench an additional 1/12 turn. 

3. Close electrical disconnects to energize system. 
4. Set  room  thermostat  at  desired  temperature.  Be  sure  set  point  is

below indoor ambient temperature.

5. Set room thermostat to HEAT or COOL and fan control to ON or

AUTO  mode,  as  desired.  Operate  unit  for  15  minutes.  Check

system refrigerant charge.

Sequence of Operation

NOTE: 

Defrost control board is equipped with 5 minute lockout timer

that is initiated upon any interruption of power. 
Turn on power to indoor and outdoor units. Transformer is energized. 
These models utilize a 2-stage indoor thermostat.  With a call for first

(low)  stage  cooling  or  heating,  the  outdoor  fan  and  low-stage

compressor are energized.  If low-stage cannot satisfy cooling or heating

demand, high-stage is energized by the second (high) stage of the indoor

thermostat.    After  the  second  stage  is  satisfied,  the  unit  returns  to

low-stage  operation  until  second  stage is  required again.  When  both,

first and second stage cooling or heating are satisfied, the compressor

will shut off.

Cooling

With first stage cooling,  Y1 and O are powered on; and with second

stage  cooling,   Y2, Y1  and  O  are  powered  on.   The  O  energizes  the

reversing valve, switching it to cooling position.  The Y1 signal sends

low  voltage through the safeties and energizes the T1 terminal on the

circuit board.  If the compressor has been off for 5 minutes, or power has

not  been  cycled  for  5  minutes,  the  OF2  relay  and  T2  terminal  will

energize.  This will close the contactor and start the outdoor fan motor

and compressor.  When the cycle is complete, Y1 is turned off, stopping

the  compressor  and  outdoor  fan.    The  5  minute  time  guard  begins

counting.  Compressor will not come on until this delay expires.  In the

event  of  a  power  interruption,  the  time  guard  will  not  allow  another

cycle for 5 minutes.

Heating

With first stage heating, Y1 is powered on; with second stage heating,

Y2 and Y1 are powered on.  The Y1 signal sends low voltage through

the safeties and energizes the T1 terminal on the circuit board.  If the

compressor has been off for 5 minutes or power has not been cycled for

5 minutes, the OF2 relay and T2 terminal will energize.  This will close

the contactor and start the outdoor fan motor and compressor.
When the cycle is complete, Y1 is turned off, stopping the compressor

and outdoor fan.  The 5 minute time guard begins counting.  Compressor

will  not  come  on  until  this  delay  expires.    In  the  event  of  a  power

interruption, the time guard will not allow another cycle for 5 minutes.

Compressor Operation

The  basic  scroll  design  has  been  modified  with  the  addition  of  an

internal  unloading  mechanism  that  opens  a  by-pass  port  in  the  first

compression pocket, effectively reducing the displacement of the scroll.

The opening and closing of the by-pass port is controlled by an internal

electrically operated solenoid.  The modulated scroll uses a single step of

unloading to go from full capacity to approximately 67% capacity.

A single speed, high efficiency motor continues to run while the scroll

modulates between the two capacity steps.  Modulation is achieved by

venting a portion of the gas in the first suction pocket back to the low

side of the compressor, thereby reducing the effective displacement of

the compressor.

Full  capacity  is  achieved  by  blocking  these  vents,  thus increasing  the

displacement to 100%.  A DC solenoid in the compressor controlled by a

rectified 24 volt AC signal in the external solenoid plug moves the slider

ring that covers and uncovers these vents.

The  vent  covers  are  arranged  in  such  a  manner  that  the  compressor

operates  at  approximately  67%  capacity  when  the  solenoid  is  not

energized  and  100%  capacity  when  the  solenoid  is  energized.    The

loading and unloading of the two step scroll is done ”on the fly” without

shutting off the motor between steps.

NOTE: 

67%  compressor  capacity  translates  to  approximately  75%

cooling or heating capacity at the indoor coil.

The compressor will always start unloaded and stay unloaded for five

seconds even when the thermostat is calling for high stage capacity.

Quiet Shift-2

Quiet  shift-  2  is  a  field  selectable  defrost  mode  (factory  set  to  OFF),

which will reduce the occasional noise that could be heard at the start of

defrost cycle and restarting of heating cycle. It is selected by placing DIP

switch  3  on  defrost  board  in  the  ON  position.    When  Quiet  Shift-  2

switch is placed in ON position, and defrost is initiated, the following

sequence of operation will occur: The compressor will be de- energized

for approximately 1 minute, then the reversing valve will be energized.

A few seconds later, the compressor will be re- energized and the normal

defrost cycle starts.

Once  defrost  termination  conditions  have  been  met,  the  following

sequence  will  occur:  The  compressor  will  be  de-  energized  for

approximately 1 minute, then the reversing valve will be de- energized.

A few seconds later, the compressor will be re- energized and the normal

heating cycle starts.

CAUTION

!

PERSONAL INJURY HAZARD

Failure to follow this caution may result in personal 

injury.
Wear  safety  glasses,  protective  clothing,  and  gloves  when  handling

refrigerant and observe the following: 
• Front seating service valves are equipped with Schrader valves.

CAUTION

!

ENVIRONMENTAL HAZARD

Failure to follow this caution may result in environmental damage.
Federal  regulations  require  that  you  do  not  vent  refrigerant  to  the

atmosphere. Recover during system repair or final unit disposal.

CAUTION

!

UNIT OPERATION AND SAFETY HAZARD

Failure to follow this caution may result in personal injury, equipment

damage or improper operation.
• Do not overcharge system with refrigerant.

• Do not operate unit in a vacuum or at negative pressure.

• Do not disable low pressure switch in scroll compressor applications.

• Compressor dome temperatures may be hot.

Summary of Contents for N4H7T

Page 1: ...opriate for unit capacity 3 Run refrigerant tubes as directly as possible by avoiding unnecessary turns and bends 4 Leave some slack between structure and unit to absorb vibration 5 When passing refri...

Page 2: ...pace for airflow clearance wiring refrigerant piping and service Allow 24 in 609 6 mm clearance to service end of unit and 48 in 1219 2 mm above unit For proper airflow a 6 in 152 4 mm clearance on 1...

Page 3: ...ton body of the liquid service valve temporarily held in place with a plastic cap Do not remove the plastic cap until line set tubing is ready to be installed Refer to Fig 4 and follow these steps for...

Page 4: ...h a heat sinking material such as a wet cloth Braze joints using a Sil Fos or Phos copper alloy Install Liquid Line Filter Drier Indoor Refer to Fig 6 and install filter drier as follows 1 Braze 5 in...

Page 5: ...readily accessible from unit per Section 440 14 of NEC Route Ground and Power Wires Remove access panel to gain access to unit wiring Extend wires from disconnect through power wiring hole provided a...

Page 6: ...at the Y2 signal is communicated via the cool tap to the desired speed tap 2 The Y1 call for low stage cooling energizes the Fan tap on the control board The red wire from the fan tap is connected to...

Page 7: ...5 minute time guard begins counting Compressor will not come on until this delay expires In the event of a power interruption the time guard will not allow another cycle for 5 minutes Compressor Opera...

Page 8: ...or temperature is between 70 F and 80 F 21 11 C and 26 67 C Follow the procedure below Unit is factory charged for 15ft 4 57 m of lineset Adjust charge by adding or removing 0 6 oz ft 018 kg m of 3 8...

Page 9: ...nit before adding panels and covers Securely fasten all panels and covers 3 Tighten service valve stem caps to 1 12 turn past finger tight 4 Leave Owner s Manual with owner Explain system operation an...

Page 10: ...ved A Carrier Company Edition Date 03 22 Catalog No N4H7T 01SI Replaces New N4H7T Installation Instructions Manufacturer reserves the right to change at any time specifications and designs without not...

Reviews: