2.7
CONNECTING THE SYSTEM
2.7.1
Input power
+24 V dc and 0 V dc power input cables for the Control Unit should be terminated onto Supply Input
(terminal block TB1).
Cables should be segregated from high voltage cables and follow good installation practice
Note all terminations should be made using crimped wires.
For each of the power connections strip the power cable to the required length to connect to the
terminals in the Control Unit. Then remove approximately 1cm of the outer sheath to expose the cable
screen as shown below.
A
B
0v
SCN
Remote Display
Unit 5m Cable
Cable To
Control Unit
GND (Black)
A (Red)
Screen
B (Black)
Remote Display
Unit 5m Cable
Cable To
Control Unit
Screen
GND (Black)
B (Black)