CL-1
Start-Up Checklist
The following is a checklist to be completed before start-up:
1. General visual unit and system inspection
Yes
No
2. Check that unit is level
Yes
No
3. Record electrical supply voltage
Yes
No
4. Check all wiring for secure connections
Yes
No
5. Verify with straight edge alignment of motor and blower pulleys
Yes
No
6. Tighten all set scews
Yes
No
7. Confirm V-belt is properly tightened
Yes
No
8. Check condensate drain connection
Yes
No
9. Verify trap is deep enough
Yes
No
10. Prime the trap with water
Yes
No
11. Check supply and return water connections for leaks
Yes
No
12. Fill systems with water by opening supply ball valve and control valve
Yes
No
13. Open air vent on top of coil to vent air out of system
Yes
No
14. Open return ball valve
Yes
No
15. Engage power only long enough to verify proper blower rotation
Yes
No
16. Check all ductwork and grilles in place
Yes
No
17. Check all unit panels and filters in place
Yes
No
18. Start fans, pumps, chillers, etc.
Yes
No
19. Check for overload conditions of all units
Yes
No
20. Check all ductwork and units for air leaks
Yes
No
21. Balance water systems, as required
Yes
No
22. Balance air sytems, as required
Yes
No
23. Record all final settings for future use
Yes
No
24. Check piping and ductwork for noise or vibration
Yes
No
25 Check all dampers for proper operation
Yes
No
26. Verify proper cooling operation
Yes
No
27. Verify proper heating operation
Yes
No
28. Reinstall all covers and access panels
Yes
No
29. Verify proper condensate drainage
Yes
No