©2022 Carrier. All Rights Reserved.
A Carrier Company
Edition Date: 05/22
Catalog No:AG-KC019SPN-04
Replaces:AG-KC019SPN-03
AGAGC9PNS01D Gas Conversion Kit, Propane to Natural: Installation Instructions
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
16
A11451
Fig. 25 – Modulating Gas Valve Adjustment
13. Turn furnace gas valve switch to ON position.
14. Turn on furnace power supply.
15. Set room thermostat to call for heat.
16. Check pressure tap plug for gas leaks when main burners ignite.
17. Check for correct burner flame.
LABEL APPLICATION
1. Fill in Conversion Responsibility Label 348712-205 and apply to
Blower Access Door of furnace. Date, name, and address of
organization making this conversion are required, see
.
2. Attach Conversion Rating Plate Label 348712-201, -204, -206,
-207, -208 or -209 to outer door of furnace, see
,
or
3. Attach Gas Control Conversion Label 348712-202 to gas valve. Do
not use 348712-203, which is similar.
CHECKOUT
1. Observe unit operation through two complete heating cycles.
2. See Sequence of Operation in furnace Installation, Start-Up, and
Operating Instructions.
3. Set room thermostat to desired temperature.
A221027
Fig. 26 – Gas Conversion Responsibility Label
A221026
Fig. 27 – Gas Control Conversion Label
WARNING
!
FIRE HAZARD
Failure to follow this warning could result in personal injury, death,
and/or property damage.
Manifold pressure trap set screw must be tightened or 1/8-in. (3 mm)
NPT pipe plug must be installed to prevent gas leaks.