START-UP CHECKLIST
I. PRELIMINARY INFORMATION
MODEL NO.:
SERIAL NO.:
DATE:
TECHNICIAN:
II. PRE-START-UP (insert checkmark in box as each item is completed)
j
VERIFY THAT JOBSITE VOLTAGE AGREES WITH VOLTAGE LISTED ON RATING PLATE
j
VERIFY THAT ALL PACKAGING MATERIALS HAVE BEEN REMOVED FROM UNIT
j
REMOVE ALL SHIPPING HOLD DOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS
j
VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
j
VERIFY THAT FLUE HOOD IS INSTALLED
j
CHECK REFRIGERANT PIPING FOR INDICATIONS OF LEAKS; INVESTIGATE AND REPAIR IF NECESSARY
j
CHECK GAS PIPING FOR LEAKS
j
CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
j
CHECK THAT RETURN (INDOOR) AIR FILTERS ARE CLEAN AND IN PLACE
j
VERIFY THAT UNIT INSTALLATION IS LEVEL
j
CHECK FAN WHEELS AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW
TIGHTNESS
j
CHECK TO ENSURE THAT ELECTRICAL WIRING IS NOT IN CONTACT WITH REFRIGERANT LINES
OR SHARP METAL EDGES
j
CHECK PULLEY ALIGNMENT AND BELT TENSION PER INSTALLATION INSTRUCTIONS
III. START-UP (REFER TO UNIT SERVICE/MAINTENANCE MANUAL FOR START--UP
INSTRUCTIONS)
ELECTRICAL
SUPPLY VOLTAGE
L1-L2
L2-L3
L3-L1
CIRCUIT 1 COMPRESSOR AMPS
L1
L2
L3
CIRCUIT 2 COMPRESSOR AMPS
L1
L2
L3
INDOOR-FAN AMPS
OUTDOOR-FAN AMPS
NO. 1
NO. 2
TEMPERATURES
OUTDOOR-AIR TEMPERATURE
DB
WB
RETURN-AIR TEMPERATURE
DB
WB
COOLING SUPPLY AIR
DB
WB
GAS HEAT SUPPLY AIR
DB
PRESSURES (Cooling Mode)
GAS INLET PRESSURE
IN. WG
GAS MANIFOLD PRESSURE
IN. WG (LOW FIRE)
IN. WG (HI FIRE)
REFRIGERANT SUCTION, CIRCUIT 1
PSIG
F
REFRIGERANT SUCTION, CIRCUIT 2
PSIG
F
REFRIGERANT DISCHARGE, CIRCUIT 1
PSIG
F
REFRIGERANT DISCHARGE, CIRCUIT 2
PSIG
F
j
VERIFY THAT 3-PHASE FAN MOTOR AND BLOWER ARE ROTATING IN CORRECT DIRECTION.
j
VERIFY THAT 3-PHASE SCROLL COMPRESSOR IS ROTATING IN THE CORRECT DIRECTION
j
VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS
GENERAL
j
SET ECONOMIZER MINIMUM VENT AND CHANGEOVER SETTINGS TO MATCH JOB REQUIREMENTS
(IF EQUIPPED)
Summary of Contents for 50LC 07
Page 9: ...9 COOLING CHARGING CHARTS C150169 Fig 9 Cooling Charging Charts 07 ...
Page 10: ...10 COOLING CHARGING CHARTS C150172 Fig 10 Cooling Charging Charts 08 ...
Page 11: ...11 COOLING CHARGING CHARTS C150170 Fig 11 Cooling Charging Charts 09 ...
Page 12: ...12 COOLING CHARGING CHARTS C150171 Fig 12 Cooling Charging Charts 12 ...
Page 27: ...27 C150181 Fig 34 50LC 07 Control Wiring Diagram ...
Page 28: ...28 C150225 Fig 35 50LC 07 RTU Open Control Wiring Diagram ...
Page 29: ...29 C14095 Fig 36 50LC 07 Power Wiring Diagram 208 230V 460V and 575V Units ...
Page 30: ...30 C14013 Fig 37 50LC 08 12 Control Wiring Diagram ...
Page 31: ...31 C14104 Fig 38 50LC 08 12 RTU Open Control Wiring Diagram ...
Page 32: ...32 C14105 Fig 39 50LC 08 12 Power Wiring Diagram 208 230V Units ...
Page 33: ...33 C150216 Fig 40 50LC 08 12 Power Wiring Diagram 460V 575V Units ...
Page 57: ...57 C13683 Fig 62 Typical EconoMi er X Wiring Diagram ...