7 - CHECKING BEFORE COMMISSIONING

Importante: Nunca se debe poner en marcha el equipo sin haber leído previamente la totalidad del manual.

Models 90 to 360

Models 420 to 600

Terminal box or electric cabinet

(depending on the options installed)

Access panel 

Electric cabinet

7.1 Electrical connections

Installation norms

To  perform  the  electric  installation  of  the  unit  (cable  glands, 
conductor section and their calculations, protections, etc.), refer 
to  the  technical  characteristic  table  provided  in  the  technical 
brochure  of  this  series,  the  electrical  scheme  included  with 
the unit and norms in eff ect that regulate the installation of air 
conditioning units and electrical receivers. 

The electric power supply of the unit must be sized in accordance 
with the maximum power input by the unit taking into account 
all  the  options  it  features  (if  necessary,  refer  to  the  technical 
brochure).

Verify that electrical power corresponds to the one on the data 
plate and that the voltage remains constant.

Connecting optional devices

Indoor units 40ZS/ZF have an auxiliary terminal box or electric 
cabinet for the connection of optional elements such as the soft 
starter, dirty fi lter pressostat, etc.

7.2 Checks in the centrifugal fans

-  Before commissioning, check the blade rotation direction and 

that the axis turns without strokes nor vibrations

-  Once  running,  check  the  operation  conditions:  pressures, 

fl ows and consumptions.

-  The overlapping of characteristic curves of the fan and the 

room  is  very  important,  so  that  the  fl ows  and  pressures 
provided to the duct network are as required.

Connection with the outdoor unit

In the case of connection of a unit 40ZS/ZF with an outdoor unit 
38ZS/ZF, the instruction manual of the condensing unit should 
be consulted (No.10258), since the electrical connection of both 
units is explained there.

Check that the electrical connections are correct and 
tight (an electrical diagram is included with each unit, 
along with its legend).

Note:

 All connections in the site are the responsibility 

of the installer. These connections are always made 
as per the current regulation.

To  prevent  electrical  shocks,  make  all  electrical 
connections before energizing the unit. Check that the 
automatic  switch  is  closed.  Omitting  this  can  cause 
personal damage. Make the ground connection before 
any other electrical connection.

The  installer  must  fix  line  protection  elements 
according to the eff ective legislation.

•  Soft starter detail (optional):

  Soft starter of the supply and/or return centrifugal fans which 

prolongs the set time mainly aimed at installations with cloth 
ducts. Compulsory for motors with an output of 15 kW and 
above.

Summary of Contents for 40ZF Series

Page 1: ...Nominal cooling capacity 20 135 kW Nominal heating capacity 20 145 kW Indoor units INSTALLATION OPERATION AND M A I N T E N A N C E I N S T R U C T I O N S Translation of the original document 80259...

Page 2: ...SSIONING 9 7 1 Electrical connections 9 7 2 Checks in the centrifugal fans 9 7 3 Checks in plug fans optional 10 7 4 Air ducts connections 11 7 5 Condensate drain connection 11 8 SAFETY ELEMENTS 12 9...

Page 3: ...ak to atmospheric pressure the liquid phase evaporates The resulting vapours are still hazardous because they are heavier than air and can force the latter out of the machine rooms If refrigerant is a...

Page 4: ...11 I MS221 I R N R N MC111 N E R I R MC011 MC021 N E R R I N N E E MC001 I I 40ZS ZF 420 to 600 assemblies with mixing box raised view N E MC101 R I I I I Designation 1 Rear Return 2 Top 3 Right hand...

Page 5: ...t causing damage to the units or to workers These slings will be hooked to the two grips screwed on each crossbar in models 420 to 600 Make sure that the unit is protected from contact with the hooks...

Page 6: ...0 705 1 044 MC0 1 088 1 350 660 1 224 MC1 1 148 1 350 930 1 697 40ZS ZF MS module Centre of gravity mm Weight kg X Y Z 90 100 120 Montajes 111 116 413 314 411 114 113 311 121 126 423 324 421 124 123 3...

Page 7: ...ade With the help of the crane or the forklift truck the unit will be raised to a su cient height that the silent blocks can be screwed into its base The 4 silent blocks of the corners must remain obl...

Page 8: ...600 1 300 2 061 40ZS ZF 90 to 360 40ZS ZF 420 to 600 6 3 Anchorage for silent blocks 6 4 Recommended service clearance for unit start up and maintenance operations mm 1000 1000 500 1700 500 1000 A 500...

Page 9: ...fans Before commissioning check the blade rotation direction and that the axis turns without strokes nor vibrations Once running check the operation conditions pressures ows and consumptions The over...

Page 10: ...entrifugal motorfans are coupled through pulleys and belts In these fans the following must be taken into consideration Pulley alignment The pulleys must be on the same plane so it is important to che...

Page 11: ...G Models 90 to 360 These indoor units are equipped with a condensate drain pan with a bronze gas threaded 3 4 M drain junction Condensate drain CONNECT SIPHON METTRE SIPHON PONER SIFON V220014 7 5 Con...

Page 12: ...nsidered when selecting fans the pressure drop graphs in the options can be seen in the technical brochure 9 1 Mixing box In models 90 to 360 of the 40ZS ZF unit the mixing box is a separate module Th...

Page 13: ...imensions mm A B C 90 100 120 1 supply outlet 6 9 1 row 150 482 443 12 2 rows 262 482 443 160 180 1 supply outlet 12 15 18 1 row 189 1 142 443 182 200 240 2 supply outlet 15 18 1 row 189 1 142 443 24...

Page 14: ...to connect the hose to the electric power supply If it is not possible to perform the previous step the distance between holes as well as the frame dimensions are displayed in the following schemes S...

Page 15: ...se frames to the unit four supports are provided In the case of 2 frames screw each one of them to 2 supports with the four M4 screws included in the kit The height of the frame on the support will de...

Page 16: ...l in the technical brochure of this series Water outlet Water inlet Models 40ZS ZF 90 to 360 Recomendations Coil lling The coil lling must be made with the bleeder valve open until water runs through...

Page 17: ...re assembled over a sheet steel pro le Models 40ZS ZF 90 to 360 Modelos 40ZS ZF 420 to 600 Opacimetric filters Gravimetric filters Sheet profile Tab for displacement of gravimetric filters Tab for dis...

Page 18: ...oise we recommend the use of noise dampening headgear Caution Before intervening in the unit cut o main power 10 1 General recommendations Do not lean on the unit A platform must be used to work on a...

Page 19: ...ecovered for treatment Refrigerant Energy transfer uid depending on the installation water glycol water mix Compressor oil Important In order to recycle these units follow the stipulations of Directiv...

Page 20: ...Order No 10259 12 2020 Supersedes order No 07 2019 Manufactured for CARRIER in Spain Manufacturer reserves the right to change any product specifications without notice Printed in the European Union...

Reviews: