background image

7

6 - POSITIONING AND INSTALLATION

40ZS/ZF

90

100

120

160

180

182

200

Total dB(A)

79

82

80

80

80

82

85

40ZS/ZF

240

320

360

420

485

540

600

Total dB(A)

82

83

85

86

87

89

92

6.1 Choice of location

When  choosing  the  location,  whatever  may  be  the  selected 
fashion,  the  following  precautions  have  to  be  taken  into 
consideration:

-   It is mandatory to comply with norm EN 378-3 on Safety and 

Environmental Requirements. Part 3: “In situ” installation and 
protection to people.

-  The  area  where  the  unit  will  be  located  must  be  perfectly 

accessible for cleaning and maintenance operations (check 
minimum free space for maintenance). Leave enough space 
for air circulation around the unit.

-  It is necessary to check that the surface of the fl oor or the 

structure  supports  the  weight  of  the  unit  (please,  consult 
the  weight  of  the  unit  in  the  section  “Centre  of  gravity 
coordenates”). 

-  It is necessary to ensure that the surface where the unit is 

going  to  be  installed  in  completely  fl at. Any  defect  in  the 
preparation of the unit support surface translates into stresses 
on the structure, which may result in its deformation.

-   These units can be installed on the fl oor or on a brick frame 

or  steel  profi le.  Based  on  the  fi xing  solution  defi ned  in  the 
installation project, it will be necessary to plan the placement 
in the base of threaded rods in the expectation that the unit 
supports can be fi xed later on. To do so, it is recommended 
that a template be made with the heights corresponding to 
the fi xings.

Foresee appropriate damping devices in these fi xings 
to  ensure  that  noise  and  vibration  transmission  is 
avoided  (refer  to  the  section  “Anchorage  for  silent-
blocks”).

-  In  the  event  of  assembling  directly  on  silent-blocks  to  the 

ground, it is recommended that a template of the unit’s footprint 
with the anchoring points of the silent-blocks be made. 

-  With  the  help  of  the  crane  or  the  forklift  truck,  the  unit  will 

be raised to a suffi  cient height that the silent-blocks can be 
screwed into its base. The 4 silent-blocks of the corners must 
remain oblique and the interiors (if these exist) perpendicular 
to the unit.

All  indoor  units  are  designed  for  their  indoor  installation, 
connected to a duct network. 

Necessary precautions must be taken to prevent the recirculation 
of air as well as obstructions.

-  All models can be installed on the fl oor or on a brick frame or 

steel profi le.  

-  Models 90 through 360 can be attached to the ceiling using 

the threaded rod:

•  Insert in the framework ceiling 4 threaded rods.

•  Insert the rods through the holes the unit has in its base.

•  Place the antivibration mounts, insert a washer and turn the 

nuts until the unit is well secured.

•  If there is enough space between the framework and the 

unit, a rubber or neoprene plate can be squeezed in.

•  Once these operations are fi nished, a false ceiling can be 

mounted to hide the unit, leaving a register cover to perform 
the maintenance and fi lter cleaning operations. 

  The fi lter is mounted on a rail that can be removed from the 

side or from the base, to replace or clean it.

holes for threaded 

rods, 

15mm

panels for 

fi

 lter removal

6.2 Sound level

These units have been designed to operate with a low sound 
level. In any case, in the design of the installation, it must be 
taken into consideration: 

-  the outdoor environment for the acoustic radiation, 

-  the type of building for the noise transmitted in the air and the 

solid elements for the vibration transmission. 

If  necessary,  a  study  must  be  commissioned  to  an  acoustic 
technician.

Sound  power  level  in  the  indoor  fan  outlet  to  be  taken  into 
account for the silencer calculation:

Sound power level

•  Also, in case the installation has an air return which is not 

ducted, appropriately-sized grids must be foreseen in the 
space formed by the ceiling, the framework and the walls so 
that the unit aspires the return air from the air conditioned 
spaces. 

Summary of Contents for 40ZF Series

Page 1: ...Nominal cooling capacity 20 135 kW Nominal heating capacity 20 145 kW Indoor units INSTALLATION OPERATION AND M A I N T E N A N C E I N S T R U C T I O N S Translation of the original document 80259...

Page 2: ...SSIONING 9 7 1 Electrical connections 9 7 2 Checks in the centrifugal fans 9 7 3 Checks in plug fans optional 10 7 4 Air ducts connections 11 7 5 Condensate drain connection 11 8 SAFETY ELEMENTS 12 9...

Page 3: ...ak to atmospheric pressure the liquid phase evaporates The resulting vapours are still hazardous because they are heavier than air and can force the latter out of the machine rooms If refrigerant is a...

Page 4: ...11 I MS221 I R N R N MC111 N E R I R MC011 MC021 N E R R I N N E E MC001 I I 40ZS ZF 420 to 600 assemblies with mixing box raised view N E MC101 R I I I I Designation 1 Rear Return 2 Top 3 Right hand...

Page 5: ...t causing damage to the units or to workers These slings will be hooked to the two grips screwed on each crossbar in models 420 to 600 Make sure that the unit is protected from contact with the hooks...

Page 6: ...0 705 1 044 MC0 1 088 1 350 660 1 224 MC1 1 148 1 350 930 1 697 40ZS ZF MS module Centre of gravity mm Weight kg X Y Z 90 100 120 Montajes 111 116 413 314 411 114 113 311 121 126 423 324 421 124 123 3...

Page 7: ...ade With the help of the crane or the forklift truck the unit will be raised to a su cient height that the silent blocks can be screwed into its base The 4 silent blocks of the corners must remain obl...

Page 8: ...600 1 300 2 061 40ZS ZF 90 to 360 40ZS ZF 420 to 600 6 3 Anchorage for silent blocks 6 4 Recommended service clearance for unit start up and maintenance operations mm 1000 1000 500 1700 500 1000 A 500...

Page 9: ...fans Before commissioning check the blade rotation direction and that the axis turns without strokes nor vibrations Once running check the operation conditions pressures ows and consumptions The over...

Page 10: ...entrifugal motorfans are coupled through pulleys and belts In these fans the following must be taken into consideration Pulley alignment The pulleys must be on the same plane so it is important to che...

Page 11: ...G Models 90 to 360 These indoor units are equipped with a condensate drain pan with a bronze gas threaded 3 4 M drain junction Condensate drain CONNECT SIPHON METTRE SIPHON PONER SIFON V220014 7 5 Con...

Page 12: ...nsidered when selecting fans the pressure drop graphs in the options can be seen in the technical brochure 9 1 Mixing box In models 90 to 360 of the 40ZS ZF unit the mixing box is a separate module Th...

Page 13: ...imensions mm A B C 90 100 120 1 supply outlet 6 9 1 row 150 482 443 12 2 rows 262 482 443 160 180 1 supply outlet 12 15 18 1 row 189 1 142 443 182 200 240 2 supply outlet 15 18 1 row 189 1 142 443 24...

Page 14: ...to connect the hose to the electric power supply If it is not possible to perform the previous step the distance between holes as well as the frame dimensions are displayed in the following schemes S...

Page 15: ...se frames to the unit four supports are provided In the case of 2 frames screw each one of them to 2 supports with the four M4 screws included in the kit The height of the frame on the support will de...

Page 16: ...l in the technical brochure of this series Water outlet Water inlet Models 40ZS ZF 90 to 360 Recomendations Coil lling The coil lling must be made with the bleeder valve open until water runs through...

Page 17: ...re assembled over a sheet steel pro le Models 40ZS ZF 90 to 360 Modelos 40ZS ZF 420 to 600 Opacimetric filters Gravimetric filters Sheet profile Tab for displacement of gravimetric filters Tab for dis...

Page 18: ...oise we recommend the use of noise dampening headgear Caution Before intervening in the unit cut o main power 10 1 General recommendations Do not lean on the unit A platform must be used to work on a...

Page 19: ...ecovered for treatment Refrigerant Energy transfer uid depending on the installation water glycol water mix Compressor oil Important In order to recycle these units follow the stipulations of Directiv...

Page 20: ...Order No 10259 12 2020 Supersedes order No 07 2019 Manufactured for CARRIER in Spain Manufacturer reserves the right to change any product specifications without notice Printed in the European Union...

Reviews: