2.3 - Setup
Handle the boxes carefully. Lift them using a lifting beam suitable for the size of the unit (refer to the diagrams below), two steel tubes
(minimum diameter 1": 33.7 mm external; maximum 1¼": 42.7 mm external) and straps, as per the handling instructions (minimum
angle of 60°).
Important: Make sure that the spreader beam is sufficiently large so that the straps do not press against the unit and the
steel tubes are immobilised while moving the unit.
B
B
B
Limiting sideways movement
If using a spreader beam is not possible, the unit may be lifted using a forklift truck provided care is taken to avoid denting the bottom
panel (use sufficiently long forks).
Follow the applicable handling rules.
2 - DELIVERY AND HANDLING
6