background image

Make sure no gas come out from connections 
with leak detector or soap water.

A: Lo packed valve  B: Hi packed valve 
C and D are ends of indoor unit connection.

CAUTION

2. GAS LEAK CHECK

Indoor unit
check point

D

B

C

A

Outdoor unit
check point

Cover

3. TEST OPERATION

Perform test operation after completing gas leak check at the flare nut 
connections and electrical safety check.
1. Connect the power, push the 

"

COOL

"  

button on the remote 

    controller to begin  testing.
2. Check if all the functions works well while testing the air conditioner.
    A protection feature prevents the air conditioner from being activated 
    for about 3 minutes when it is restarted immediately after operation 
    or when the power switch is turned on.
3. Be sure to set the tickle-type switch on OFF after finishing the test 
    operation.

Auto/cool   o

Manual 

switch 

When relocate the unit to another place,
use vacuum pump to perform evacuation.

Choose purge method from the table:

When Using the Vacuum Pump

(For method  of using a  manifold valve, refer to its operation manual.)
1. Completely tighten the flare nuts, A, B, C, D, connect the manifold 
    valve charge hose to a charge port of the packed valve on the gas
    pipe side.
2. Connect the charge hose connection to the  vacuum pump.
3. Fully open the handle Lo of the manifold valve.
4. Operate the vacuum pump to evacuate. After starting evacuation, 
    slightly loose the flare nut of the packed valve on the gas pipe side 
    and check that the air is entering.(Operation noise of  the vacuum  
    pump changes  and  a  compound meter indicates 0 instead of 
    minus)
5. After  the  evacuation is complete, fully close the handle Lo of the 
    manifold valve and stop the operation of the vacuum pump.
    Make evacuation  for  15  minutes and more and check that the 

5

    compound meter indicates  -76cmHg(-1.0x10 Pa).
6. Disconnect  the charge hose from the charge connection of  the 
    packed  valve  at  the  gas  pipe side.
7. Fully open the packed valve stems B and A.
8. Securely tighten the cap of the packed valve.

Connective
pipe length

Less than 5m

5   10m

(Pipe length-5)x30g

Air purging
method

Use vacuum
pump

Additional amount of
refrigerant to be charged

Open the valve stem until it hits against the
stopper. Do not try to open it further.
Securely tighten the valve stem cap with a
spanner or the like.
Valve stem cap tightening torque.
Gas pipe side ( 9.53): 2940N.cm (300kgf.cm)
Liquid pipe side ( 6.35): 1570N.cm (160kgf.cm)

.

.

.

.

.

CAUTION IN HANDING THE PACKED VALVE

1. AIR PURGE

~

Manifold valve

Outdoor
unit

Indoor
unit

Refrigerant gas

Flare nut

Stopper

Compound meter

-76cmHg

Handle Lo

Handle Hi

Charge hose

Charge hose

Vacuum pump

Pressure gauge

Cap

Valve body

Packed valve

Half union

12.7mm

6.35mm

A

C

D

B

Packed valve

Valve stem

9.53mm

( 10000Btu/h)

( 9000Btu/h)

Use vacuum
pump

For the R407C refrigerant model, make sure
the refrigerant added into air conditioner is 
liquid form in any cases.

.

AIR PURGE AND TEST OPERATION

3

GB-10

42HQE009(012)/38YE009(012)

Summary of Contents for 38YE009(012)

Page 1: ...R 407C GB INSTALLATION MANUAL I MANUALE DI INSTALLAZIONE F MANUEL D INSTALLATION S INSTALLATIONSMANUAL E MANUAL DE INSTALACION GR 42HQE009 012 38YE009 012...

Page 2: ...I F ITALIANO E Acondlclonador de aire split unidad interlor Hi Wall Climatizzatori split unit interna Hi Wall FRANCAIS Climatiseur split unit int rieure Hi Wall ESPANOL GR S SVENSKA Split system Hi Wa...

Page 3: ...ed to a strong wind Aplace that is dry and ventilated A place can bear the weight of the outdoor unit and where the outdoor unit can be held in the horizontal position A place which does not allow an...

Page 4: ...efully Check that the impedance of the mains power supply is in conformance with the unit power input indicated in the electric EN 61000 3 11 Control batteries contain polluting elements When exhauste...

Page 5: ...tion The outdoor unit should not be exposed to strong wind Fix the outdoor unit with 10 or 8 anchor bolts air outlet air inlet A B Remote controller Mounting screw B ST2 9x10 C H Remote controller hol...

Page 6: ...lls make 6mmdia holes in the wall Insert clip anchors for appropriate mounting screws 3 Fix the installation plate on the wall 1 As diagram above determine the pipe hole position using the installatio...

Page 7: ...iping install the piping as shown Bend the conn ective pipe to be laid at 43mm height or less from the wall 3 Fix the end of the connective pipe Refer to Tightening Connection in REFRI GRANT PIPING CO...

Page 8: ...made by lifting the indoor unit with a cushioning material between the indoor unit and the wall Get it out after finish piping 4 Push the lower part of the indoor unit up on the wall Then move the ind...

Page 9: ...lowing installation conditions do apply 1 The power connection for the air conditioner has to be done at the main power distribution The distribution has to be of an low impedance normally the require...

Page 10: ...he installation bracket should accord with technique requir ement in the installation bracket diagram Strong wind 1 OUTDOOR INSTALLATION PRECAUTION Mod Amm 38YE009 012 B mm C mm D mm E mm F mm A B C D...

Page 11: ...ring Regulation All wiring must comply with local and national electrical codes and be installed by qualified and skilled electrician Cover Screw Cooling heating type Terminals on the outdoor unit Wir...

Page 12: ...lightly loose the flare nut of the packed valve on the gas pipe side and check that the air is entering Operation noise of the vacuum pump changes and a compound meter indicates 0 instead of minus 5 A...

Page 13: ...dotto pu comportare senza preavviso cambiamentio modifiche aquanto descritto La recherche permanentede perfectionnement duproduit peut n cessiter des modificationsou changements sans pr avis El fabric...

Reviews: