63
9. Remove motor and motor support
8. Remove electric reactor
7. Remove electric box assy
Remove screws fixing electric box assy and
mid-isolation board, loosen the bonding tie, pull off the
wiring terminal, lift to remove the electric box assy.
Remove the four tapping screws fixing motor, pull out
the contact tag of motor wiring, to remove the motor.
Remove the two tapping screws fixing motor support
and chassis, lift to remove the motor support.
Remove the screws fixing electric reactor, to remove
the electric reactor.
electric box assy
electric box cover
electric
reactor
motor support
motor
Summary of Contents for 38GRQB09-3
Page 10: ...10 Outdoor unit Fig 11 Sizes 09 12...
Page 46: ...46 EXPLODED VIEW AND PARTS LIST Indoor Unit Fig 47 Indoor Unit...
Page 48: ...48 OUTDOOR UNIT Fig 48 Outdoor Unit...
Page 50: ...50 Fig 49...
Page 53: ...53 Shut off power hold both ends of horizontal...
Page 54: ...54...
Page 55: ...55...
Page 56: ...56 ziptie side cutters...
Page 57: ...57...
Page 58: ...58...
Page 59: ...59...
Page 60: ...60...
Page 73: ...73 6 7 8...
Page 74: ...74 9 Remove electric box 10 Remove evaporator...
Page 75: ...75...
Page 76: ...76 11 Remove swing blade...
Page 77: ...77 12 Remove cross flow blade and motor...
Page 78: ...78 13 Remove drive box...
Page 90: ...90 APPENDIX Appendix 1 Reference Sheet of Celsius and Fahrenheit...
Page 95: ...95 UNIT BREAKDOWNS a b c d e...
Page 96: ...96 f g h...
Page 97: ...97...
Page 98: ...98...
Page 99: ...99...