![background image](http://html1.mh-extra.com/html/carrier/30awh-025qi/30awh-025qi_installation-manual_2562143026.webp)
Inverter Hybrid Boiler
24
10m
or below
10m
or below
Oil trap
Hydro Unit
Hydro Unit
Outdoor Unit
Liquid loop
Liquid line
Gas line
Install
at intervals
of 10m
Outdoor Unit
Spring
R100mm or greater
Length and height of piping
Bending processing of pipe
1
2
Install the oil trap and liquid loop at
the correct position depending on
the installation location of the indoor/
outdoor unit.
● The maximum allowable length of piping is 30m.
● Bend a pipe correctly in one attempt.
Bending and straightening a pipe 2 times or more may cause damages to the pipe.
● The minimum bending radius should be 100mm.
The maximum allowable height of
piping is 10m.
Installation of indoor/outdoor
unit