![background image](http://html1.mh-extra.com/html/carrier/30awh-025qi/30awh-025qi_installation-manual_2562143028.webp)
Inverter Hybrid Boiler
26
W
ater
piping
①
Union(water pipe, 25A)
②
Pressure relief valve
③
Manometer
④
Service ball valve(15A)
⑤
Strainer
⑥
Ball valve(25A)
⑦
Domestic hot water pump(output less than 80W)
⑧
Air vent
⑨
Check valve(25A)
⑩
Drain valve
⑪
Expansion tank
⑫
Water supply valve
⑬
DHW tank temperature sensor
⑭
Remote controller
P
P
Hydro Unit
Hot Water Tank
On site installation
①
②
③
④
⑤
⑥
⑧
⑦
⑨
⑩
⑪
⑫
⑬
Main
PCB
RC
⑭
Water Out
Water In