Safe Installation and Operation
Installation of the device must be in accordance with the relevant national or
local regulations. Correct grounding and short circuit protection must be
provided to ensure operational safety.
Read all instructions and caution remarks in the manual before installation.
Switch off the circuit breakers before installation and wirings. Avoid standing
on wet surfaces when working on the inverter.
PV arrays will be energized when exposed to light. Cover the arrays with
opaque (dark) material during installation and wiring. Always make sure the
DC switch is on the OFF position.
Check both of the AC and DC connections with a digital volt meter prior to
any installation or removal procedures.
Close the cover properly before switching on the circuit breakers.
Not to install the inverter exposed to direct sunlight
When no external voltage is present; the ISMG3 inverter can still contain high
voltages. There is still risk of electrical shocks.
Allow at least 5 minutes for the inverter to discharge completely after
disconnecting the AC and DC sources from the inverter.
External heat sinks can reach a relatively high temperature in normal
operation and
cause skin burn injury if touched. Pay attention to it.
To prevent the risk of fire hazard, do not cover or obstruct the heat sink.
Any modification to the electrical system shall be carried out only by qualified
electricians.
Summary of Contents for ISMG 315
Page 1: ...User Manual ISMG 315 ISMG 320 Three Phase Solar Inverter...
Page 2: ...2 2010 Carlo Gavazzi Automation All rights reserved V 1 3 July 2010...
Page 26: ...16 Fig 2 2 3 Fasten the mounting bracket...
Page 28: ...18...
Page 31: ...21 Fig 2 3 2 Loosen the screws...
Page 34: ...24 Fig 2 3 5 Wiring box front view...
Page 44: ...34 Fig 2 3 3 3 RS 232 connection ISMG 45S0918 Fig 2 3 3 4 RS 485 connection...
Page 83: ...73 4 Technical Documentation 4 1 Outline Drawing Fig 4 1 1 Outline Drawing of ISMG3...
Page 91: ...81 Your Notes...