6
6
Installation
Installation
6-15
6-15
Installation > Installation Procedure > Installation Procedure (iR-ADV C9075 PRO/C9070 PRO/C9065 PRO/C9060 PRO Series, iR-ADV C7065/C7055 Series) > Installing the Super G3 3rd/4th Line Fax Board
Installation > Installation Procedure > Installation Procedure (iR-ADV C9075 PRO/C9070 PRO/C9065 PRO/C9060 PRO Series, iR-ADV C7065/C7055 Series) > Installing the Super G3 3rd/4th Line Fax Board
19) Install the Box Cover (Left).
20) Affix the FAX MJ Label [1].
[1]
21) Insert the Reader Power Supply Cable and the Telephone Cords (2 cords) removed in
step 1.
22) Remove the 2 Dust Covers [1].
[1]
F-6-40
F-6-41
23) Insert one end of the Telephone Cord [1] included in the package to the Modular Jack [2]
for the line of the host machine, and insert the other end of it to the Modular Jack on the
wall.
[2]
[1]
F-6-42