5
5
3
3
Installation > Checks to Make before Installation > Checking the Installation Space
Installation > Checks to Make before Installation > Checking the Installation Space
Checks to Make before Installation
Requirements for the installation place are given below.
It is recommended to look over the place to be used for installation before delivering the
equipment to the user.
Checking the Power Supply
The machine must be connectable the outlet that can supply the rated v10/-15% at
the specified ampere or higher.
120V 15A
230V 10A
Caution
The socket-outlet shall be installed near the equipment and shall be easily accessible.
Checking the Installation Space
1.The minimum space required for installation and maintenance is shown below.
1000mm or more
1320mm
1000mm or more
1150mm
950mm
12
00
m
m
13
00
m
m
Pallet
Slope plates
Paper Deck
1150mm
1060mm
3200mm
990mm
1000mm
or more
F-5-2
F-5-2