Installation > Unpacking Procedure
Installation > Unpacking Procedure
Unpacking Procedure
Caution:
The equipment is secured with packaging tapes and
cushioning materials to protect it against vibration
and shock during transportation. Before starting
the installation work, remove all packaging tapes
and cushioning materials following the specified
procedure. Keep the removed cushioning materials
for later use in case of relocation and repair.
Do not use a forklift when lifting the equipment.
•
•
1
1) Unpack the equipment and take out the deck left front cover.
2
2) Take out the upper cushioning material, host machine right
cover, and handle.
3
3) Put the plastic bag off as shown.
4
4) While holding the leaf spring of the supplied handle, insert it in this equipment.
F-5-5