4
4
50
50
Parts Replacement and Cleaning Procedure > Removing the PCBs > Removing the Deck Open Switch PCB (PCB5/PCB6/PCB7)
Parts Replacement and Cleaning Procedure > Removing the PCBs > Removing the Deck Open Switch PCB (PCB5/PCB6/PCB7)
Removing the Deck Open Switch PCB (PCB5/PCB6/PCB7)
MEMO:
The removal procedure of the deck
open switch PCB from the upper deck
is described below. The procedure
of the middle and lower decks is the
same.
1) Remove the upper deck cover.
(Refer to:4-19)
2) Remove two screws and then remove the deck open switch PCB.
x2
3) Remove connectors from the deck open switch PCB.
F-4-123
F-4-124