5
5
30
30
Installation > Installation Procedure > Checking for Operation
Installation > Installation Procedure > Checking for Operation
4
4) Close the upper deck. Install the size indication plates on the middle deck and lower deck in the same
manner.
Checking for Operation
1) Supply paper from each deck to check whether paper is fed normally.
F-5-76
F-5-76