![Canada Docks Do-It-Yourself Assembly Instructions Manual Download Page 6](http://html.mh-extra.com/html/canada-docks/do-it-yourself/do-it-yourself_assembly-instructions-manual_491059006.webp)
CanadaDocks-Assembly-Instructions-Ver17 08/08/19
Manufactured by: CanadaDocks Inc. 3690 Adjala-Tecumseth Townline RR2 Beeton, ON, Canada L0G 1A0 | 1-877-434-0359 | www.canadadocks.ca
|
“Do-It-Yourself”
Aluminum Docks
Canada
Docks
TM
Canada
Docks
.
ca
TM
Page 6
N
Place joist into the frame. For 4x8 Dock, place a 47”
long joist(M). For 8x8 Dock place a 95” long joist(N).
The procedure for installing joists is the same for 4x8 and 8x8 frames.
The only difference are the number of joists added to the bottom of
the frame. The 4x8 dock receives 2 joists and the 8x8 receives 5 joists.
For 4x8 Docks measure 24 ¼”from the edge of the joist to the outside of the truss frame
and position truss here. This will ensure that there is a structure to mount the float to.
Use vice grips or a clamp to hold the joist against the truss frame.
11
1
1
2 3 4 5
2
10
12
In the centre of the joist attach joist to the
truss using a #12x3/4” screw (O) and #3
Phillips Drill Bit.
Repeat this step for the
opposite.
JOIST INSTALLATION
13
M
14
4x8
24 ¼”
24 ¼”
24 ¼”
24 ¼”
8x8
4x8
4x8
8x8
8x8
Place the second joist 24” from the edge of the dock for both 4x8 and 8x8 docks. Repeat instructions from steps 12 & 13 for this joist.
Ensure the long end of the joist is facing
upwards when placing joists.