Section 2. Hardware Installation
2.8 Battery Installation
Power Switch
FIGURE 2.8-1. PS100 Battery Installation
The PS100 power switch should be in the “OFF” position. To install the
battery, remove the cover from the PS100 by sliding the latch up at one end of
the cover and sliding the cover down and out. Install the battery as shown in
Figure 2.8-1. Plug the battery lead into the connector labeled “BATTERY –
Internal 12V 7 Amp-Hour”. Put the cover back on the PS100 and latch it in
place.
Do not switch the power supply to “on” until AC or solar power
has been connected to the back of the enclosure.
NOTE
The red charge light on the PS100 will glow when charging voltage is present.
The charge light is not effected by the switch. Switching on the power supply
without a charging voltage will run the battery down.
Figure 2.8-2 shows factory wiring between the PS100 and the enclosure.
FIGURE 2.8-2. PS100 to ET107 Enclosure Wiring
2-45
Summary of Contents for ET107
Page 8: ...ET107 Weather Station Table of Contents vi This is a blank page...
Page 68: ...Section 3 ET Software 3 2 This is a blank page...
Page 86: ...Section 4 Maintenance Troubleshooting and Schematics 4 18...
Page 101: ...Appendix C Exploded Views C 1 Enclosure C 1...
Page 102: ...Appendix C Exploded Views C 2 Crossarm C 2...
Page 109: ......