3
Al
l t
he
d
at
a
an
d
in
fo
rm
at
io
n
co
nt
ai
ne
d
he
re
in
is
c
on
si
de
re
d
su
bj
ec
t t
o
ch
an
ge
a
t a
ny
ti
m
e
an
d
at
o
ur
d
is
cr
et
io
n.
ENGLISH
5 .1 Preliminary checks
55
5 Installation
Before proceeding with installation, it is necessary to:
• Check that the point of attachment of the control panel is protected from shocks, the fastening surfaces are solid, and appro-
priate components (screws, plugs, etc) are used for fastening to the surface.
• Provide for an appropriate omni-polar disconnection device with a distance of more than 3 mm between the contacts, to
shunt the power supply
•
Check that the connections inside the case executed for continuity of the protection circuit are allowed, provided they have
supplementary isolation with respect to the other internal conducting parts.
• Prepare adequate cable troughs and hoses for the electrical wires, to ensure protection against mechanical damage.
5.2 Equipment and materials
Be sure to have all the instruments and materials necessary to execute installation in utmost safety, in accordance with prevai-
ling standards. Here are a few examples.
5.3 Size and distances of fastening holes
.3
.3
It is best to use a fillister head Phillips screws, maximum diameter of 6 mm.
������
������
������
������
������
������
2 1
5
2
9
5
Holes are 20/21 mm.