background image

- - -

ESC         <           >       ENTER

ESC         <           >       ENTER

o P   I

c l   I

c l   i

o p   I

=

=

p. 

2

0

20

 - M

an

ua

l c

od

e: 

F

A

0

0

0

6

F

A

0006

8

-E

N

8-

E

N

 v.

 

1

 

04/2

01

5 © C

am

e S

.p.

A

. - T

he d

ata a

nd i

nfo

rm

ati

on i

n th

is

 m

an

ua

l m

ay b

e c

ha

ng

ed at a

ny ti

m

e a

nd w

ith

ou

t n

oti

ce

.

Activate procedure A 2, see Functions detail table.

Activate procedure A 3, see Functions detail table.

After pressing, the 

 waiting [ ] will 

appear. 

Keeping the button pressed,   check 
that the turnstile performs a CLOCKWISE 
maneuver.

Then, use the button   to check that 
the turnstile performs a COUNTER 
CLOCKWISE maneuever.

If the rotations are correct, move on to travel calibration.

Motors test

After pressing, the 

 leaf will 

perform a clockwise movement until it 
mechanically stops.

Then an inverted movement until the final 
mechanical stop.

 Before calibrating the travel, check that the maneuvering area is free of any obstructions.

 During the calibration, all of the safety devices will be disabled except for the Total Stop.

Travel calibration

Wait a few seconds for the registrations to 
appear on the display.

 The leaf closing position is established as the bisector of the final closing stops.

 Always start programming the turnstile from this procedure.

With an entry direction other than the default one (see function F-54) the direction of opening could be 

inverted.

Summary of Contents for SALOON40

Page 1: ...SWING LEAF TURNSTILE FA00068 EN English EN INSTALLATION MANUAL SALOON40...

Page 2: ...d to an effective regulation grounding system The manufacturer declines any liability for using non original products which would result in warranty loss All maintained action commands must be tted in...

Page 3: ...er direction can be activated by a card reader photocells or other control device The opening speed of the 90 leaf is preset The leaf opening can be automatic it closes after a preset time or activate...

Page 4: ...4 2015 Came S p A The data and information in this manual may be changed at any time and without notice Main components 1 Insulation tube 2 Inspection cover frame 3 Inspection hatch 4 Bushing covering...

Page 5: ...ensure continuity to the protection circuit are fitted with additional insulation with respect to those of other electrical parts inside Make sure the passage area is in a proper state and without any...

Page 6: ...A00068 EN 8 EN v 1 1 04 2015 Came S p A The data and information in this manual may be changed at any time and without notice Standard installation 1 Swing leaf turnstile 2 Control device 3 Barrier 4...

Page 7: ...the space available where to t the operator and accessories will vary depending on the installation site It is up to each installer to select the most suitable solution Careful Use hoisting equipment...

Page 8: ...p 8 Manual code FA0006 FA00068 EN 8 EN v 1 1 04 2015 Came S p A The data and information in this manual may be changed at any time and without notice...

Page 9: ...the anchoring base as shown in the drawing the leaf is perpendicular to the wall Mark the anchoring holes with a pencil Note when installing up against walls respect the minimum distance of 40 mm Fit...

Page 10: ...ng screws NETWORK POWER SUPPLY 230V AC Factory configuration NETWORK POWER SUPPLY 120V AC Invert cables 1 and 2 as shown Fastening the turnstile to the ground Connect the line power supply to the card...

Page 11: ...p 11 11 Manual code FA0006 FA00068 EN 8 EN v 1 1 04 2015 Came S p A The data and information in this manual may be changed at any time and without notice...

Page 12: ...A The data and information in this manual may be changed at any time and without notice At this point of the mounting use the control panel to check that the turnstile works properly the direction of...

Page 13: ...p 13 13 Manual code FA0006 FA00068 EN 8 EN v 1 1 04 2015 Came S p A The data and information in this manual may be changed at any time and without notice Center the tube with the control panel...

Page 14: ...Programming buttons 2 Programming warning LED 3 Memory roll card connector 4 R700 card connection of the first control device 5 R700 card connection of the second control device 6 Display 7 Control de...

Page 15: ...pply to the acces sories Overall allowed power 10 W Power supply 24 V AC Network power supply Transformer Clean contacts NO for connecting to warning devices Contact rated at 24 V 500 mA Terminals C N...

Page 16: ...r closing devices For details see function F 54 Contact N O of the rst SENSOR 1 control device Transponder or card reader with R700 card Contact N O of the second SENSOR 2 control device Transponder o...

Page 17: ...ramming by first performing functions A 2 Motor test and A 3 Travel calibration F 1 Total stop F 2 Setup input 2 CX F 3 Setup input 2 CY F 19 Automatic closing F 21 Preflashing F 28 Opening speed F 29...

Page 18: ...euvers calculated as a percentage Setting from 40 to 100 of the motor speed F 29 Closing speed Setting the speed during the closing maneuvers calculated as a percentage Setting from 40 to 80 of the mo...

Page 19: ...by the RBM84 access control see F 49 it is best to assign a univocal number to each one The maximum number of allowed turnstiles is 255 F 57 Offset closing limit switch See detail in the Offset closin...

Page 20: ...s are correct move on to travel calibration Motors test After pressing the leaf will perform a clockwise movement until it mechanically stops Then an inverted movement until the final mechanical stop...

Page 21: ...hout notice Offset closing limit switch Select F 57 Press ENTER to confirm Press the arrow key to compensate the limit switch closes counter clockwise Press ENTER to confirm After calibrating the trav...

Page 22: ...rd or other control device The number stays fixed for an instant to show that the user registration has been completed Select U 2 Press ENTER to confirm Select the number of the user to delete by usin...

Page 23: ...2 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136...

Page 24: ...configuring the MASTER turnstile Connect the two TOR 300 control boards with the CAT 5 U UTP AWG 24 multi pair woven unscreened cable to terminals A B GND Connect all of the necessary devices onto TOR...

Page 25: ...r until the come to a full stop The leaves will perform an inverted maneuver until the come to a full stop Transferring parameters from MASTER to SLAVE To transfer the parameters from MASTER to SLAVE...

Page 26: ...r network Check proper state of the button The turnstile stays open after a passage Automatic closing function deactivated Photocells employed Call assistance Call assistance Periodic maintenance Ever...

Page 27: ...f the fundamentals of our operating and market strategies Simply follow these brief disposal guidelines DISPOSING OF THE PACKAGING The packaging materials cardboard plastic and so on should be dispose...

Page 28: ...sson di Casier Treviso Treviso Italy 33079 Sesto al Reghena Sesto al Reghena Pordenone Pordenone Italy 39 0422 4940 39 0422 4941 39 0434 698111 39 0434 698434 English English Manual code FA000 FA00068...

Reviews: