2
1
5 ÷ 10
2
1
3
p.
11
- M
an
ua
l
FA
010
84
-E
N
- 0
2/
20
18 - © C
AM
E S
.p
.A
. - "
Tr
an
sl
at
ed o
rig
in
al i
ns
tru
ct
io
ns
"
Perforate the cable gland and fit it into its housing after threading the cables.
Lift the gearmotor by 5 to 10 mm from the plate by adjusting the threaded steel feet to allow any subsequent
adjustments between pinion and rack.
SETTING UP THE GEARMOTOR
Remove the gearmotor cover by turning the side bolts.
Place the gearmotor above the anchoring plate.
Careful! The electric cables must pass under the gearmotor case.
Summary of Contents for OPS001
Page 2: ...3 2 1 1 2 3 4...
Page 26: ...3 2 1 1 2 3 4...
Page 50: ...3 2 1 1 2 3 4...
Page 73: ...OPS OPS001 RU FA01084 RU...
Page 74: ...3 2 1 1 2 3 4...
Page 75: ...3 FA01084 RU 02 2018 CAME S p A CAME S p A 2006 42 CE 2006 42 CE 2006 42 CE 2 5...
Page 76: ...4 FA01084 RU 02 2018 CAME S p A 3 III 1 85 1 5 2006 42 CE...
Page 81: ...3 0 0 450 40 0 50 2 UNI 5734 12 UNI 5588 M12 9 FA01084 RU 02 2018 CAME S p A 40 25 50...
Page 82: ...95 105 10 FA01084 RU 02 2018 CAME S p A 600 24...
Page 83: ...2 1 5 10 2 1 3 11 FA01084 RU 02 2018 CAME S p A 5 10...
Page 84: ...1 2 12 FA01084 RU 02 2018 CAME S p A...
Page 85: ...1 2 1 2 13 FA01084 RU 02 2018 CAME S p A...
Page 94: ...2 1 22 FA01084 RU 02 2018 CAME S p A...
Page 95: ...23 FA01084 RU 02 2018 CAME S p A CAME S p A UNI EN ISO 14001...