p.
66
- M
an
u
al
c
od
e:
F
A
0
0
5
8
3
-E
N
FA
0
0
5
8
3
-E
N
v.
1
1
10
/2
0
1
6 - © C
am
e S
.p.
A
. T
h
e c
onte
nts of th
is
m
an
u
al
m
ay b
e c
h
an
g
ed at a
ny ti
m
e w
ith
ou
t p
rio
r n
oti
ce
.
Fill the hole with earth around the concrete block.
Remove the nut and washer from the bolts
Fit the electric cables into the tubes so that they come out about 600 mm.
Place the plate over the iron cage.
Fill the foundation frame with concrete. The base must be perfectly level with the bolts which are entirely above surface.
Wait at least 24 hrs for the concrete to solidify.
Remove the foundation frame.
Set up a foundation frame that is larger than the anchoring plate and sink it into the dug hole.
Fit an iron cage into the foundation frame to reinforce the concrete.
Assemble the four anchoring braces to the anchoring plate.
Summary of Contents for G4040EZT
Page 1: ...English EN Русский RU Italiano IT Français FR FA00583M04 BARRIERE AUTOMATICHE ...
Page 33: ...English EN INSTALLATION MANUAL G4040EZT AUTOMATIC BARRIERS FA00583 EN ...
Page 65: ...Français FR MANUEL D INSTALLATION G4040EZT BARRIÈRES AUTOMATIQUES FA00583 FR ...
Page 97: ...Русский RU ИНСТРУКЦИЯ ПО МОНТАЖУ G4040EZT АВТОМАТИЧЕСКИЕ ДОРОЖНЫЕ ШЛАГБАУМЫ FA00583 RU ...