p.
77
- M
an
u
al
c
od
e:
F
A
0
1
0
3
0
-E
N
FA
0
1
0
3
0
-E
N
v.
11
- 0
1/
2
0
18 - © C
am
e S
.p.
A
. - T
h
e m
an
u
al
's c
onte
nts m
ay b
e e
d
ite
d at a
ny ti
m
e w
ith
ou
t n
oti
ce
.
Prepare a foundation frame that is larger than the anchoring plate and sink it into the dug hole.
Insert an iron cage into the foundation frame to reinforce the concrete.
Attach the four anchoring clamps to the anchoring plate.
Place the plate over the iron cage.
Fill the foundation frame with concrete. The base must be perfectly level and the bolts entirely above surface.
Wait at least 24 hrs for the concrete to solidify.
Remove the foundation frame.
Fill the hole with earth around the concrete block.
Remove the nut and washer from the bolts.
Insert the electric cables into the tubes so that they protrude by about 600 mm.
Summary of Contents for G2080E
Page 33: ...Automatic barriers GARD 8 series G2080E G2080IE INSTALLATION AND OPERATION English FA01030 EN...
Page 65: ...Barri res automatiques s rie GARD 8 G2080E G2080IE MANUEL D INSTALLATION Fran ais FA01030 FR...
Page 97: ...GARD 8 G2080E G2080IE FA01030 RU...
Page 98: ...2 FA01030 RU 1 01 2018 CAME S p A CAME S P A 2 5 20 1 8 1 5 EN12453 EN12445 8...
Page 103: ...7 FA01030 RU 1 01 2018 CAME S p A 24 600...
Page 104: ...N M 8 FA01030 RU 1 01 2018 CAME S p A 90 M N...
Page 105: ...UNI5931 M8x20 UNI5931 M8x12 UNI5931 M8x20 UNI6954 2 9x13 9 FA01030 RU 1 01 2018 CAME S p A...
Page 107: ...11 FA01030 RU 1 01 2018 CAME S p A 45 UNI5739 M12x70 UNI5588 M12...
Page 113: ...1 8 9 1 8 9 17 FA01030 RU 1 01 2018 CAME S p A 89...
Page 121: ...10 11 1 E 10 11 1 E 4 Z L 3 8 25 FA01030 RU 1 01 2018 CAME S p A...
Page 125: ...29 FA01030 RU 1 01 2018 CAME S p A 6...
Page 127: ...31 FA01030 RU 1 01 2018 CAME S p A CAME S p A UNI EN ISO 14001...