background image

1

7

6

5

8

2

4

4

9

3

Pa

g.

 

44

  - 

Ma

n

u

al

 c

od

e: 

11

9

A

U

1

4

E

N

11

9

A

U

1

4

E

N

 ve

r.

 

1

  

1  

0

9

/2

0

14  © C

A

M

E c

an

ce

lli

 auto

m

ati

ci

 S

.p.

A

. - 

Th

e d

ata a

n

d i

nf

or

m

ati

on r

ep

orte

d i

n th

is

 in

sta

lla

tio

n m

an

u

al

 a

re s

u

sc

ep

tib

le to c

h

an

g

e at a

ny ti

m

e a

n

d w

ith

ou

t o

b

lig

ati

on

 o

n C

A

M

E c

an

ce

lli

 auto

m

ati

ci

 S

.p.

A

. to n

otify u

se

rs.

ENGLISH

4.3 Description of parts

1.  Gate pin-housing ring
2.  Gearmotor pin-housing ring
3.  Gearmotor mobile ring
4.  Endstop adjustment set screw 
5. Release 

group

6. Cover
7. Operator
8. In-ground 

case

9.  Custom key for release 

group

4.4 Dimensions

(mm)

5 Installation

 

Before installing, do the following:

• Make sure you have a suitable omnipolar cut-off device with contacts more than 3 mm apart, and independent (sectioned off) 
power supply.
• Make sure you have suitable tubing and conduits for the electrical cables to pass through and be protected against mechanical 
damage.
• Fit tubing to drain away any water leaks which may cause oxidation.
•              Make  sure  that  any  connections  inside  the  case  (that  provide  continuance  to  the  protective  circuit)  be  fitted  with  extra 
insulation as compared to the other conductive parts inside;
• Make sure the structure of the gate is sturdy, the hinges work and that the is no friction between moving and non-moving parts.
• Make sure there is a mechanical stop for opening and closing.

 

Installation must be carried out by expert qualified personnel and in full compliance with current regulations.

5.1 Preliminary checks

Summary of Contents for FROG J

Page 1: ...INSTALLATION MANUAL FROG J IN GROUND OPERATOR FOR SWING GATES English EN 119AU14EN...

Page 2: ...system conforms to standards EN 12453 and EN12445 impact testing making sure the device has been pro perly adjusted and that the safety and protection and release devices function properly Where neces...

Page 3: ...arts of the operator are a foundation casing a release group a gearmotor and a transmission arm The foundation casing is made of 1 5 mm thick ABS plastic on the sides and of 4mm galvanised steel on th...

Page 4: ...omnipolar cut off device with contacts more than 3 mm apart and independent sectioned off power supply Make sure you have suitable tubing and conduits for the electrical cables to pass through and be...

Page 5: ...he sizes given on the table must be re evaluated based on actual power draw and distances When connecting products that are not specified in this manual please follow the documentation provided with s...

Page 6: ...inside view To facilitate insertion of the in ground casing remove the gate and lower hinges Dig a pit to house the foundation casing set up the shunt boxes and corrugated plastic conduits for connect...

Page 7: ...mission arm with the pin housing ring to the stuffing box anchor them using the M6x16 set screws and nuts Warning the threaded holes for inserting the m10x90 adjustment set screw of the gate pin housi...

Page 8: ...the nut at the opposite end without tightening it completely Insert the gearmotor into the in ground box and anchor it using bolts and washers N B Place the gearmotor s pin housing ring exactly below...

Page 9: ...ps Closing set screw for left gearmotor Procedure for adjusting the opening follow the same steps used in adjusting the closing Note max opening arc of the gate leaf is 105 Before tightening the set s...

Page 10: ...A to notify users ENGLISH After making the necessary adjustments and electrical connections see following chapter place the cover onto the box and screw it down using the supplied cylinder head screw...

Page 11: ...llation manual are susceptible to change at any time and without obligation on CAME cancelli automatici S p A to notify users ENGLISH Re blocking procedure Raise the protective cover of the blocking m...

Page 12: ...y users ENGLISH 6 Connecting to the control panel When making electrical connections use the pit the shunt boxes For further instructions concerning functions and adjustments consult the control panel...

Page 13: ...er s signature Job performed ______________________________________________________________________________________ ____________________________________________________________________________________...

Page 14: ...ask you to keep protecting the environment as CAME deems it to be one of the fundamental points of its market operations strategies by simply following these brief guidelines when disposing DISPOSING...

Page 15: ...AU14EN ver 1 1 09 2014 CAME cancelli automatici S p A The data and information reported in this installation manual are susceptible to change at any time and without obligation on CAME cancelli automa...

Page 16: ...nformaci n sobre la empresa los productos y asistencia en su idioma NL Voor meer informatie over het bedrijf de producten en hulp in uw eigen taal PT Para toda e qualquer informa o acerca da empresa d...

Reviews: