9
INSTALLATION: CSW-10AT-LFT METER Continued
7)
Secure the signal cable at the scale section end and at the top of the mast
with wire ties provided.
8)
Fully extend the mast to all positions to confirm the cable will not be
stretched too tight. Check to make sure the cable will not be pinched or
caught in any mechanical parts of the mast as it is being used.
9)
Secure the cable with the wire ties provided in several locations.
10)
Attach cable to summing box in the scale section. Make sure this is a
tight connection.
You are now ready to turn on the
CSW-10AT-LFT
indicator and begin operation.
Summary of Contents for DL-CSW-10AT-LFT
Page 1: ......