Chapter 5: Installation
Installing the ODU and top LPU
2 (a) Fasten one ground cable to each ODU grounding point using the M6 (small) lugs: one is for
the top LPU (M6 lug at other end) and the other is for the tower or building (M10 lug at other
end). It does not matter which cable goes on which ODU grounding point. (b) Tighten both
ODU grounding bolts to a torque of 5 Nm (3.9 lb ft).
(a) ODU ground cables:
(b) ODU ground cable tightened:
Integrated ODU
1 (a) Fix the mounting plate to the back of the ODU at an angle of 45 degrees to the vertical using
the bolts and washers provided. Tighten the four bolts to a torque setting of 5 Nm (4 lb ft).
(b) Fix the bracket body to the mounting plate using the M8 bolt.
(a) Fix the mounting plate:
(b) Fix the bracket body:
2 Hoist the ODU up to its position on the mounting pole.